= surrounded, or other approved means prior to backfill material being placed. Joints shall not be made under water. The trench must be dewatered to facilitate joint making and inspection. Precautions must be taken to prevent erosion of joint material by moving currents of water. Drainage lines shall be constructed with a tolerance of 10mm in line or level over any section 30m in length (providing each pipe unit has a fall in the direction of flow) from the alignment and levels shown on the drawings. All concrete used in drainage works shall, unless otherwise specified or shown on the drawings, be Class N25 concrete in accordance with AS 3600. §.4.2 Reinforced Concrete Box Culverts The base of the box culvert shall be laid true to line and grade before the upper U Portion of the box culvert segments are laid. All construction methods, tolerances and requirements for box culverts shall conform to the requirements detailed in Queensland Transport Standard Specification MRS 11.03. 5.5 Backfilling 5.5.1 Backfill Unless shown otherwise in the construction drawings, backfill material shall generally be selected fill material, not markedly different in character from the surrounding soil and free from large stones, lumps of clay, topsoil, tree roots and other rubbish. It shall have an even grading free of lumps retained on a 75mm sieve and free of stones retained on a 25mm sieve. §.5.2 Concrete and Fibre Reinforced Pipes Backfilling requires great care, and lack of attention to its selection, placement and compaction may lead to damage to a new pipeline or to other underground services adjacent to the pipeline or to neighbouring structures. The trench should be backfilled as soon as possible after pipes are laid. Compaction standards for Backfill material shall conform to the following requirements. The level of compaction required shall be as follows: Note: Compaction requirements are with reference to the relevant Test Methods contained in AS 1289. For trench installations, mechanical compacters shall be used. Where impact tampers are used, caution must be exercised not to allow a direct blow on the pipe. The material should be compacted at near optimum moisture content and should be brought up evenly in layers not exceeding 150mm on both sides of the pipe up to 150mm over the pipe. It should not be bulldozed into the trench nor dropped directly on the pipe. Heavy mechanical equipment must not be used for tamping of backfill or be permitted to run over 41/22382/11840 Glirraween Sports Precinct 30 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.