Skip to the record
Noosa’s premier civic archive.

Council archive · source document

06/1168 - Change a Development Approval [As Published] · 132006.1168.02

of 199

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

=

The compound shall be applied by spraying with pressure tank equipment having provision for continual
agitation of contents during application. Where forms are removed during the curing period the exposed
concrete shall be lightly sprayed with water and such moistening continued until the surface will not
readily absorb more water, and as soon as the moisture film has disappeared the curing compound shall
be applied to the concrete surface.

6.12 Surface Finish

All concrete surfaces shall be true and free from stone pockets, depressions or projections beyond the
surface. All arrises shall be perfectly sharp and true and all mouldings evenly mitred. Care shall be
exercised in removing forms to ensure this result. As soon as the forms are removed, all rough places,
holes and porous spots shall be repaired by removing defective work and filling with stiff cement mortar
having the same proportions of cement and sand as was used in the concrete, and brought to an even
finish.

Bolts shall be removed and the cavities filled as described in Clause “ Formwork”

Concrete surfaces shall comply with the following classes set out in Australian Standard AS 1510 Part 1.
Contro! of Concrete Surfaces - Formwork or as required below.

» Formed exposed surfaces - Class 2
» Formed backfilled surfaces - Class 5
» Top Surfaces - steel trowel

For Class 2 surfaces blow holes greater than 12 mm are not permitted. All exposed surfaces shall be
even and true to shape, free from mortar fins, form marks or other irregularities. All Class 2 surfaces
shall be protected from staining due to mortar runs or splashing, reinforcement exposure, timber or
curing processes.

Any Class 2 surfaces not complying with this standard are to be brought to a smooth even textured finish
by bag rubbing and grinding as required.

Any staining to surfaces exposed to view shall be removed by rubbing with a carborundum block and
water until a uniform textured surface is achieved. The paste formed in the process is to be rubbed off
after drying with a dry hessian or canvas.

Plastering and mortar capping to concrete will not be permitted.

41/2238 2/11840 Girraween Sports Precinct 41
Earthworks Package

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1168 - Change a Development Approval [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.