Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= 7. Topsoiling and Grassing 7.1 General The Contractor shall topsoil and grass all bare areas remaining within the area affected by earthworks as detailed in the drawings. This shall include cuts, fills, batters and drainage works. The tendered sum shall include all operations necessary to produce grass cover in accordance with this specification. Grass seeding shall be carried out to all of the topsoiled areas unless noted otherwise. The Contractor shall be responsible for maintenance of the areas grassed until (a) the end of the Defects Liability Period; or (b) handover of playing fields to Council. Maintenance of the grassed areas shall include mowing, watering as necessary, and top-dressing where required to ensure an even grass surface. 7.2 Topsoil Operations 7.2.1 Topsoil Treatment Generally, topsoil for use on the Site shall be obtained by stripping the original topsoil from those areas affected by earthworks. The stripped topsoil is to be tested and conditioned prior to replacing. Additional testing of the topsoil at time of earthworks is to be undertaken to confirm soil conditioning required and this cost of this testing is deemed to be included in the tendered lump sum. tmported topsoil will only be required if ordered by the Superintendent. The topsoil shall be of good quality to achieve the necessary grass cover and to the satisfaction to the Superintendent. Payment for imported topsoil will be made for the in situ volume using the rate specified in the appropriate Provisional Item in the Schedule of Tender Lump Sum. If no such item exists, payment shall be made at a rate agreed between the Principal and the Contractor. Topsoil shall be temporarily stockpiled onsite, but no stockpile shall exceed 1.2m in height. No vehicle shall be permitted to travel on the stockpile. Unless otherwise shown on the drawings or otherwise specified, topsoil shall be spread at a thickness of 100mm. The thickness for the playing fields shall be as determined in Clause 3.4.5. 7.3 Playing Field Surfacing Construction The playing fields shall be ameliorated by a specialist contractor in accordance with the following procedure. In conjunction with the amelioration and seeding of the playing fields, an irrigation system shall be installed in accordance with Clause 7.4. Step by step procedure* for construction of playing field surfacing: » Final trim of playing fields is to be approved in accordance with section 3.4.5; 41/22382/11840 Girraween Sports Precinct A2 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.