06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
(2) » Soil tests shall be undertaken and assessed by a specialist contractor for assessment of required ameliorants; » Design of the proposed ameliorant quantities shall be completed, with final cost and submitted to the Superintendent for approval; » The irrigation system shall be installed (excluding the irrigation head) as per the approved design (Clause 7.4); » All composted organic matter and dolomite lime shall be spread via top dressing unit. Potassium sulphate and DAP are to be spread via fertiliser spreader; » The fields shall be cultivated (to a depth of 240mm) using a tractor operated RotaDairon (or approved equivalent). The surface shall then be levelled off using a drag mat to remove any visible depressions or humps; » The irrigation system installation shall be completed; » The contractor shall nominate a type and spread rate of proposed grass seed for approval by the Superintendent. The approved grass seed is to be placed at the approved rate. * this procedure is based on information supplied by Perfect Earth. Maintenance Period The playing fields shall be the subject of a performance based specification whereby the fields will only be accepted by the Council at such time as 95% cover has been achieved. The maintenance of the fields up until such time is solely the responsibility of the contractor. A maintenance schedule shall be supplied by the contractor and approved by the Superintendent prior to the placement of any grass seeding. This shall include a maintenance regime for establishment of grass cover until handover, and a longer term maintenance regime to be adopted by Council after handover. It is expected (subject to seasonal variation) that the fields will be handed over to Council 3 months from the completion of the seeding operation. 7.4 Irrigation System An irrigation system shall be designed with the design submitted for approval by the Superintendent for the playing fields. Recycled water will be available at the nearby water treatment plant with design and construction of the system from the take-off point at the plant included in this project. The ultimate irrigation system shall include a 130,000 litre holding tank at the water treatment plant which will deliver Class A water. The tank is sized to allow a full irrigation cycle of water. The holding tank will be installed by others. In lieu of provision of the holding tank, this project shall include a temporary takeoff point from the existing UV Filter at the treatment plant. This will include a submersible pump. The two Senior Soccer Fields (and athletics facility) only are required to be irrigated with this contract. However, the irrigation design is to include capacity to irrigate the junior fields and take off points to allow future connection shall be installed. 41/22382/11840 Girraween Sports Precinct a8 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.