Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= weather conditions unless special provisions are made to the approval of the Contract Administrator. Before priming, the pavement shall be broomed free of all loose material, dust and caked material, and any defects made good. A clean, mosaic, tightly bound surface shall be presented. Should conditions require, and if approved by the Contract Administrator the surface may be lightly watered immediately prior to priming. The following seal design is an estimate only. The Contractor shall carry out seal designs and submit to the Contract Administrator for approval prior to sealing. The first coat seal shall be cutback binder consisting of 90% bitumen and 10% power kerosene applied at an estimated rate of 1.5 I/m?, measured at a temperature of 15°C and applied at a temperature between 168°C and 178°C. The binder is to be covered with aggregate within 10 minutes after spraying. The second coat seal shall be cutback binder consisting of 90% bitumen and 10% power kerosene applied at an estimated rate of 0.9 I/m?, measured at a temperature of 15°C and applied at a temperature between 168°C and 178°C. The binder is to be covered with aggregate within 10 minutes after spraying. The bitumen shall be modified with 0.40% wet fix or similar approved during wet weather laying. Seal designs using emulsion-based binder will also be considered for approval by the Contract Administrator. 9.5 Aggregate Aggregate shall be crushed from hard, sound, durable rock. The percentage loss as measured by the Los Angeles Abrasion Test shall not exceed 30. All aggregates shall be free of excess dust, and the Contract Administrator may order the pre-washing of dusty aggregate. Aggregate test procedures are to be in accordance with Queensland Main Roads Standard Specification MRS 11.22. Unless otherwise approved, the first coat seal blinding shall be a nominal 14mm pre-coated aggregate, applied immediately after spraying at an estimated rate not less than 1 cubic metre per 90 square metres and sufficient to prevent lifting of the sealed surface by vehicles. Unless otherwise approved the second coat seal blinding shall be a nominal 10mm pre-coated aggregate applied at an estimated rate not less than 1 cubic metre per 100 square metres and sufficient to prevent lifting of the sealed surface by vehicles. The surface is to be rolled until the aggregate is firmly embedded in the binder. All surplus aggregate shall be swept up and removed from site not less than seven days after the completion of the rolling or as approved by the Superintendent. 9.6 Acceptance Tolerances The width of the prime shall not vary by more than + 150mm - 0mm. 41/22382/11840 Girraween Sports Precinct 48 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.