Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Acceptance of sealed surfaces will be subject to the availability of certified records of the works carried out. Actual rate of application of binder shall be in the range of 95% to 110% of the ordered rate. If the application rate is less than 90% or more than 110% the surface shall be resealed (unless otherwise directed). 9.7 Test Certificates for Sprayed Primes and Seals » A Supplier's certificate detailing material supplied and quality. A certificate for each coat per run is required. » Abitumen spray record detailing actual bitumen application rate, temperature and area sprayed for each run. » Anapplication record of cover application rate for each aggregate run. 41/22382/11840 Girraween Sports Precinct 49 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.