Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= 7. Soil Erosion and Sediment Control 7.1 Objectives » To comply with relevant environmental legislation (e.g. Environmental Protection Act 1994 and the associated EPP (Water)). » To minimise erosion and effectively contain any sediment or other pollutants in run-off generated by the construction activities. 7.2 Requirements 7.2.1 Erosion & Sediment Control » The Contractor will be responsible for sediment and erosion control on-site. » Controls shall be installed in accordance with the project's erosion and sediment control plan (to be attached to this document as Appendix D) and undertaken in accordance with SCRC, 2008 (and IECA guidelines, 2008, where applicable).. » Ensure vegetation clearing is staged and controls are installed progressively and as soon as possible (silt fences before site disturbance and other measures immediately following exposure of soils). » Sediment basins and/or sediment fences to be installed downstream of the work area (but outside of exclusion zones) where stormwater concentration or sedimentation is expected to be high. » Sediment build up against barriers and within sediment traps is to be cleaned out on an ‘as-needs’ basis. » Stockpiles shall be appropriately managed and protected, shall be a maximum of three (3) metres high and shall be set back at least 20 metres from drainage pathways. » Kerb and channel drain pit protection is required where applicable. » Monitor forecasts and install additional measures where heavy rainfall or storm events are predicted. » Monitoring of erosion and sediment control devices/measures is to be conducted on at least a weekly basis (daily during earthworks) (weekly inspection checklists are included in Appendix C) and immediately following heavy rainfall events. » Where controls appear to be ineffective, modifications are to be made on-site and the erosion and sediment control plan is to be updated. 7.2.2 Oust Suppression ‘Site watering (including stockpiles) will be undertaken when considered necessary by the Site Foreman, or in the event that three or more complaints relating to air quality conditions (dust entrainment) are received within a 24-hour period. Prior to commencing any watering down of the construction site for dust suppression purposes, it is recommended that contact is made with SCRC to confirm the exact requirements applying to this site and the implications of the current water restrictions. 41/22382/12 186 Girraween Sports Precinct 18 Environmentat Management Plan (Construction)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.