Where suitable, available mulch materials may be used to protect disturbed or exposed areas and
prevent the generation of dust.

7.3 Responsibilities

7.3.1 Construction Manager

The Construction Manager will be responsible for the following:

Providing all materials required to adequately and appropriately implement the erosion and sediment
controls throughout both the pre-construction and construction phases of the project.

Erecting appropriate signage or publicising a telephone number which is available during the
construction phase to receive complaints with regard to dust, erosion and sedimentation issues
associated with the project site.

Providing the necessary plant to conduct dust suppression measures effectively throughout the
duration of the construction phase.

7.3.2 Site Foreman
The Site Foreman is to be responsible for the following:

Identifying and checking the direction of stormwater flows.

Ensuring that barriers and other erosion and sediment control methods documented on the plan are
maintained in such a manner so as to prevent stormwater flows over embankments and sediment
transportation to gully pits and watercourses.

De-silting on an as-needed basis.

Conducting visual inspections of all erosion and sediment control measures implemented at the site
on a weekly basis (daily during earthworks) and after every heavy rainfall event for signs of
malfunction or maintenance requirements. and

Conducting clean-up or remedial works to all control measures/devices as necessary and —
decommissioning all measures/devices at the conclusion of the construction phase.

41/22382/12186 Girraween Sports Precinct 19

Environmental Management Plan (Construction)

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1168 - Change a Development Approval [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.