Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= 11. Waste Management 11.1 General Waste streams are expected to be generated on the construction site during the construction phase. Appropriate waste and sanitary management facilities are to be maintained on-site for the duration of the construction phase. 11.2 Objectives » To comply with relevant environmental legislation (e.g. Environmental Protection Act 1994 and the associated EPP (Waste)). » Provision of adequate and appropriate sanitary amenities and waste disposal facilities for the full duration of construction works. 11.3 Requirements » Portable ablutions facilities will be installed in an appropriate location at the project site for the duration of the construction phase. As no connection to Council's reticulated sewerage system is likely to be available, it is anticipated that chemical toilets will be installed and serviced on a regular basis until the completion of site works. » Bins for waste collection will be provided on site for utilisation by all staff and sub-contractors. Bins will be emptied/removed for disposal and replaced on an ‘as-needs’ basis. » Burning of construction waste materials on the project site is prohibited. 11.4 Responsibilities 11.4.1. Construction Manager The Construction Manager is to be responsible for the following: » Provision of all amenities and waste receptacles to be installed on-site. 11.4.2 Site Foreman The Site Foreman will be responsible for the following: » Arranging the emptying/removal and replacement of chemical toilets as required by a licensed contractor. » Arranging the emptying/removal and replacement of the solid waste bins by a waste removal contractor as necessary. » Ensuring burning of construction waste materials is not conducted at the project site. 41/22382/12186 Girraween Sports Precinct 26 Environmental Management Plan (Construction)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.