11. Waste Management

11.1 General

Waste streams are expected to be generated on the construction site during the construction phase.
Appropriate waste and sanitary management facilities are to be maintained on-site for the duration of the
construction phase.

11.2 Objectives

» To comply with relevant environmental legislation (e.g. Environmental Protection Act 1994 and the
associated EPP (Waste)).

» Provision of adequate and appropriate sanitary amenities and waste disposal facilities for the full
duration of construction works.

11.3 Requirements

» Portable ablutions facilities will be installed in an appropriate location at the project site for the
duration of the construction phase. As no connection to Council's reticulated sewerage system is
likely to be available, it is anticipated that chemical toilets will be installed and serviced on a regular
basis until the completion of site works.

» Bins for waste collection will be provided on site for utilisation by all staff and sub-contractors. Bins
will be emptied/removed for disposal and replaced on an ‘as-needs’ basis.

» Burning of construction waste materials on the project site is prohibited.
11.4 Responsibilities

11.4.1. Construction Manager
The Construction Manager is to be responsible for the following:

» Provision of all amenities and waste receptacles to be installed on-site.

11.4.2 Site Foreman
The Site Foreman will be responsible for the following:

» Arranging the emptying/removal and replacement of chemical toilets as required by a licensed
contractor.

» Arranging the emptying/removal and replacement of the solid waste bins by a waste removal
contractor as necessary.

» Ensuring burning of construction waste materials is not conducted at the project site.

41/22382/12186 Girraween Sports Precinct 26
Environmental Management Plan (Construction)

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1168 - Change a Development Approval [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.