Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
el 16. Environmental Incident Management 16.1 General It is essential that any incidents that have potential to cause environmental harm are dealt with immediately to minimise the extent of potential impact on the surrounding environment. All such events must be fully reported as quickly as possible to ensure that effective action is taken to prevent environmental harm, and to identify probable causes so that corrective action can be taken to prevent a recurrence or more serious event. This procedure details the requirements associated with immediate action, investigation, reporting, corrective action, follow-up actions and training for environmental incidents. 16.2 Objective To ensure that all environmental incidents which occur at the project site throughout the duration of construction are appropriately recorded, reported and corrected (both in the long and short term) without posing additional harm to the surrounding environment or to employees and sub-contractors working on the site. General reporting of environmental incidents shall follow Council's internal environmental incident reporting procedure. 16.3 Requirements Where an environmental incident occurs, immediate action shall be taken to contain the effects of the incident and reduce the overall level of potential environmental impact associated with the incident. In the event of a major incident (e.g. where greater than 250 litres of contaminant is accidentally discharged), the Site Foreman shall be notified immediately. The Site Foreman will be responsible for notifying the Construction Manager as soon as practicable. tnformation provided to the Construction Manager by the Site Foreman is to include: » The location of the emergency or incident; » The time of the release; » The time the Site Foreman was notified; » The suspected cause of the release; » The type of contaminant released; » Any impact on human health or safety; » The environmental harm and or environmental nuisance threatened, or caused by the release; and » Actions taken to prevent any further release and mitigate any environmental harm and or environmenta! nuisance caused by the release. The Site Foreman will also be responsible for notifying Emergency Response Services (e.g. Fire Service) as necessary and as soon as practicable after becoming aware of any emergency or major incident resulting in the release of contaminants. 41/22382/12186 Girraween Sports Precinct 33 Environmental Management Plan (Construction)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.