ENERGEX SPECIFICATION
‘LO INTRODUCTION
This specification caters for padmounted transfermer stations on customers preaises fronting ante road reserve,
Pasaounted transformer foundations to be built according to site sketch and design
atandards contalned in thls decument,
he rexponsibillty of the custamer's consultant to ensure that tha infernation contained
herein in pasted on to the ralavant contractors,
2.0 NEGOTIATIONS BETWEEN ENERGEX AND DEVELOPER:
ity aupply tor » developer, architect, ar builder, the
vith regards 16
the size and type required supp!
2. If a substation Ix required, tha substation site Is agreed upon by ENERGEX end the
custaner.
ENERGEX appron
specification, at
and ceturn,
n constryctign detalls,
conditions of supply for signature
r completes Form 2226 and returns to ENERGEX with transformer requeenent
iota: at leant 8 weeks prise notice af
quirement date
Customer excavates taundatlon and cendult trenches.
5.
6. ENERGEX
1, Custemer completes foundation and conduit instaltation,
4 latfon,
%.
10, ENERGEX installs padmount trans:
TL Customer Installs his consumer
7, ENERGEX energizes substation praviding thats
3.9 BULDING GENERAL
3.1 Building Services:
customer's
32 Workmanshipi-
Building work shall be completed in a neat tradesman Uke manney and shall be as detaled
tan the drawings appravad by ENERGEX's Branch Office before the iostallation of
euipment.
33 Construction=
Tha padmounted transformer site shall bu prepared by the customer,
‘An access area of 600 5700 is required for rabling, earthing, installation and sate
aperation of apparatus,
This area may be reduced nubject to ENERGEX approval where the footpath may be used
Ite a retaining wall and guard rall wil
a ENEAGEX Underground Distelbutia
4.00 ACCESS
4A Paragrnel~
shall have act
The onus. wll be
substation at all tiazs without having ta enter
juvtomer to salntain said acceas 24 hours a day, 7
A winium of 2.0 mateas of clear access shall be provided In front of the substation cabinet.
‘This will provi Horm end access afaund the (echable doors when opaned
for amergancy opi
Any accasy or suanoeuyring area which
leading transformers shocdd be tonstru
‘om the truck by the mobile
‘of damage to concrete slab, paving
yuner of the property,
Other Sitesi
Reter to ENERGEX Construction Supervisor.
5.00 CABLE CONOWTS
Refer ENERGEX Underground Dl
within the padaount transfornar sl
Each conduit d with @ bm braided polypropylene draw rope,
ENERGEX ed to Install an earth vire and earth rads In conduit trenches from the
nsisting of driven earth
ystem may be required bo be extandad
aining the transformer site
‘Tha budder shall natity ENERGEX's works co-ardinator one week prior ta trench and site
jon to allow the instatlation af the earthing syxtem and Location of the
3 for equipment earthing,
If the substation flogr ls not at greund level, earthing must be installed below the basement
foundations with twa separated, protected Insulated cable connections to the grid.
arthing of substation enclosures :~
Electricity Regulations 1977 - part \athan
00 ISAA Wiring
¢ manual for prot ing Set 101 M2 - 1977 Sections 3, §, 7,4 6 1
2,00 ELECTRICAL
The padnount transformer will be supptiad and installed by ENERGEX eucept by spacial
agrenaont batwaan the customer and ENEAGEX.
00 CUSTOMER'S CABLES
“bere supply lx cade avaiable from the LV busbars of the transformer, Phe customer shall
I balts, nuts, washers, cable cleats and supports and
Vihere supply is made available fron 9 circuit of a tow voltage distribution board, the
customer shall supply sil connactars, staintess steel bolts, ruts, washers and connect to the
terminals aa directed by ENERGEX.
10.0 EASEMENTS
‘Tha bdr /daveloper bt peavie Enargen italy with awrite uxdertakng that the essenents wil gratted
: ed ring Ha Gein process, Castetad shal caver the HY cable rade,
arth rd area. The ENERGEX wevtvork wl not be coca ened unl all the eegued
‘he darvetnpar eri requied to fant ths axsenenty 2s noted onthe ate plas etereed tu by Exerpes
(the Corn 2225 prt ta the supply Sein wade avedadle.
‘Ad cesta astoddated vil the cegfterty, suPvayhng dacumest pespetraton et shall be boura by tha buldar/
tenige.
‘iw lazer? developer shall Uaita 2h Eear g's property departeent a ration fo mcurieg that
di necensary éacucuntation is completed. (Contact Steve Soo Energen Property ph 3407 &131)
Tha flineing ganeral cata ot ape:
+ Gwcamarty shal be acaba to the Oepartmerd of Natrat Resources
. ge Lined (AON 878 BF SST
Marana Nx YOU 3U41 for underground electric [aero and bs Fefatered vith
‘ ddar/devaopar ll forvard the Gocument Ye Energes fu rainy acd wzetuton. Energex vil then
‘tum the dacunants to the Dalder/Gevelaper tor registration vith The department of Natural Aerources
‘he bilder developer t Fe return a capy af the Reystration Contemation Statement to (rer pax
‘AU private services easements avat be rapistared prior tu supply being made avatable fo the future
Gevrlopaent utes,
110 SAFETY FENCING
rclng at Least t
aces shall comply with the raquiraments of the Workplace Health and Safety Act,
‘AS1657 and ASW9Z6 and all agendnants,
All safaty fencing an private property shall be maintained by tha owner at no cost to Energer.
All materials shall be galvanised of finlahed in an equally durable manner, All chainvire and support
‘vires shall be PVC coated and coloured black or green.
All slavatad areas shall be provided vith toe boards and Intl type fencing.
All changes in level in excess of 3000 within 2 mature of the substation site shall be pretected by
(CONDUAT FOR ENERGER CONTAOL & PROTECTION
WHEN REGUREIGEE KOTE ot
=
nd Cacteis! Canalte
Toval of tha bedding materi pre?
‘te Energex iapecton
q
Earth view to
os required by
branch
AIL Olaanaionn aru een
TYPICAL TRENCH CROSS SECTIONS
x
Cable conduit shail be of the folloving
125mm Dia UPVC Light Duty Rigid Pressure pipe to AS2053. Conduit bends shall have a
imum radius of 1830mm.
ght tine with sealed Joints, Should any deviation be required In
shall not be greatar than 30 dagreus.
ve 750q aininum cover and shall be bedded on compacted sand or fine granular
¥SCam beyond tha RP. alignraant and shall
ye conduits terhing
fed steel draw wie
covers shall be lapped when
along the traverse axis and shall extend 60mm mininum past the #
ENERGEX APPROVAL GRE, tank,
WANE 400 UNDERGROUND CABLE PITS Polymeric cable protection cover shail be a minimum of ‘$mm thich as described In the relevant
0 Refer to Section 3 of the UDC for detalls of concrete pits Australian Standard,
mr
‘sed TINSTALL A NEW COMMUNICATIONS CONDUIT OF MINIMUM SIZE, 100mm LO PVC WHITE CONOLIT, LOCATED
DATE AT THE TOP LEVEL KEAB SIDE OF THE CONDUIT BANK.
= "SCALE: 00 NOT SCALE {PLOT SCALE-1:1000) A
she RARRTIEReeaUTMPLes OHTA: — WE UNE: Tani ENERGEX AORN Lamar
2 TRENCH INSPECTION REQUIRED PRIOR TO BACKFILLING, CULVERT INSPECTION ea tOUN Oe wie
I REQUIRED BEFORE TRANSFORMER IS DELIVERED GENERAL LAYOUT DRAWINGS =F 100
fs = 46 HOURS PRIOR NOTICE NEEDED. GIRRAWEEN SPORTS PRECINCT '
° CONTACT MR WAYNE WALKER PHONE .07 54709628 sen?
- RANSFORMER \ 5 D Al AT | TT Tt tf
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.