06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
5700
Concrete Edge
[ an
12600 SEPARATE EARTH)
— eee
=
4800 Site
FENCES WSTALLED.
Fall
4800
Real Proparty An
Fall
SUBSTATION
Lv
] Fall
PADMOUNTED
Goundery
BOUNDARY SUARDUHO &
‘AREA SURTAGLY DAAL
‘SITE CLEANED WE
HAVE 2¢00cn DEDKATEO CLEAR ZONE IN FRONT OF PLINTH.
STALL THE EARTH GRD. ASEE SHEET 34/34]
TEST EARTH GRD. (SEE SI BHEET 307392733)
Fal |
‘SEPARATE EARTH REAL
RECEIVING STSPECTEON & TEST STRUCTIONS Vore W721
ATTACH ALL OPERATIONAL LABELS.
CHECK BREATHERS & GEMOVE TRANSPORT BUNGS,
TBUBSTATION SATE ID ATTACHED, lup SC1A2I
2000
\ Bia
Un-reinforced 100/125mm thick concrete slab.
Uniculvert
Foundation
Fall |
50 Stable
i00Un- Stable J
me |
FOUNDATION DETAR
CONCRETE SURROUND DETAR
"ALL PAT CHOPS “TOUCHED UP™ WITH CORRECT COLOUR
SITE BACKFLLEO & COMPAS TEDJINO,UOING UNDER PUNTO
COMMISSION PADHOUNTED TRANSFORMER.
(MEE It applica,
Note
ENERGEX will not commision the transformer undl the transformer site has
boon completed to ENERGEX spocifientions (Including the conerota
surround).
ENERGEX specifications for construction of the tanstformar the and
instaltadon of condults on private proporty ara available at tne fotlowing wot
address,
ENERGEX APPROVAL RB,
htadAwewenergex.com.auiserIco_providersochnical_docs/aspitachnlenl_documonis.a5p oare eZ}
\Usaerground Disidbutlon Construction Paliey Manual
Saction 2 « Conduls & Trencnkng
Section 4 « Padmount Transformers
Tne ske contractor ls to refer all substation constuction queries to thelr
electrical consuttant
PADMOUNTED
SUBSTATION
Transtarmer
Earth Bar ——__]
HV /LV
Earth Grid
4
PROPERTY
my
BOUNDAI 10
ro
a“
ne WITH ENERGEX” FOR
TREWCH”TO GE INSPECTED
PRIOR TO BACKFILUNG
O
WIDE CABLE
‘SEMENT
iy
=
hit
£
+500 AT AT
GATE
TEST ION
‘ORIGHAL ISSUE 907.95.10]
A
NAME = BRANCH/OFFKE = TELEPHONE
FOR FURTHER SORAATION PLEASE CONTACT: = aay sau maRTON MAROOCHYDORE S6TBALAS
ENERGEX
TRENCH INSPECTION REQUIRED PRIOR TO BACKFILLING, CULVERT INSPECTION
REQUIRED BEFORE TRANSFORMER IS DELIVERED
~ 48 HOURS PRIOR NOTICE NEEDED.
CONTACT MR WAYNE WALKER PHONE .07 54709428
PADMOUNT CONSTRUCTION
GENERAL LAYOUT DRAWINGS
GIRRAWEEN SPORTS PRECINCT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.