Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

06/1168 - Change a Development Approval [As Published] · 132006.1168.02

of 199

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Schedule A — Response or Change to Conditions

DA Item Description

i Ta)

—|

Response

maintenance and sizes and layouts
shall also be in accordance with the
planning Scheme. Mulch types and
planting techniques shall be outlined
in items 25-31 of the policy.

Reference

Action By

   

 

24

A new full width concrete or paved path shall be constructed along
the Eenie Creek Road frontage of the site in accordance with Council’s
design standards. Care shall be taken to protect any existing
vegetation and/or any underground services.

New path to be constructed on new
alignment in accordance with SCRC
requirements, refer Nigel Walker

GHD SK10 Rev 1

 

25

Stormwater Drainage

 

 

 

Roof runoff from the new building shall be directed to a rainwater
storage system or tank (minimum storage 12 litres/m? of roof area)
that is installed to ensure water from the tank can be used for
external uses (such as watering gardens, irrigation, ornamental ponds,
water features, outdoor cleaning, etc) and for use in flushing of toilets
internal to the building. All rainwater tanks are to be designed and
installed in accordance with the Queensland Development Code
(QDC), Part 25 - Rainwater Tanks, and shall be part of the plumbing
application in conjunction with the building approval. The location
and capacity of the tanks shall be clearly shown on the plans
submitted for Building Works approval and any overflow shall be
directed to the proposed stormwater system.

Rainwater storage is included in
building design.

 

26

 

 

As the site is proposed to be filled, appropriate stormwater drainage
pipes shail be installed within the site to collect and discharge
stormwater runoff from ail adjoining properties to prevent additional
ponding/flooding on these properties.

No adjoining properties are affected
by the development.

 

For details refer
GHD drawings
C001 to C012

 

 

 

 

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1168 - Change a Development Approval [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.