06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Schedule A — Response or Change to Conditions Py Sta) No 27 Description To ensure that polluted run-off does not enter Burgess Creek, stormwater shall be treated generally in accordance with the Stormwater Quality Management and Assessment Report dated September 2006 and prepared by Callaghan & Toth. The system shall ensure that stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose- down) collected in grease/oil arrestors prior to entering the proposed GPT’s and bioretention zones. The proposed GPT’s may be designed with grease/oil arrestor capacity. All other clean stormwater, such as roof water, can be collected on site and discharged through a single underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor. To this end, a detailed management plan shall be prepared for the proposed stormwater treatment system, which shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. Response Stormwater bioretention and infiltration system included in design as per “Girraween Stormwater Management Plan” by Ecological Engineering. Stormwater calculations provided detailing sizing of pipes and pits as well as bioretention pond. Reference For details refer GHD drawings C001 to C012 Action By All site stormwater drainage shall be by means of a gravity system. Yes 29 —t. All stormwater drainage lines including inter-allotment drainage shall be inspected by closed circuit television (CCTV) prior to commencement of the approved Use. CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV inspection, including any additional inspection necessary following To be included in construction documentation
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.