Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Schedule A — Response or Change to Conditions DA Item Description No defect identification and rectification. This charge is payable prior to the issue of Operational Works approval and will be determined on the unit rate basis current at the time of approval. Response ite Action By Sewer Mains 30 The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council. Sewer pump station to be installed with clubhouse construction. Waste water to be pumped to contro! manhole adjacent to sewer treatment plant as determined by SCRC Water The proposed package sewerage pumping station shall have emergency storage tanks with a capacity of 24 hour storage to minimise risk of spillage to Burgess Creek. The standard EOne design drawing shows the capacity in the WW is 3.15kL. Based on our conservative design estimates, the Average Day Flow is approximately 3.8kL/day. Therefore the storage equates to approximately 20 hrs. This is a duty/standby pump arrangement so it should be ok. Alternatively it is possible to increase the tank size (if required). The system is a closed system so no spillage to Burgess Ck will occur. If the system fails it will simply back up. 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.