Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= AS/NZS ISO 9004.5: Part 5. Guidelines provided by Australian Standard AS/NZS ISO 3905: shall also apply. The Project Quality Plan shall cover all quality system elements required by the appropriate Quality Systems Standard as specified, that are applicable to this Contract. As a minimum the Project Quality Plan shall contain the following information: » A Project Organisation Chart or list of nominated Project Personnel showing their positions, lines of communication and details of the responsibilities of the positions. » Details of the qualifications and experience of the following positions: — Project Manager; - Contractor's Quality Representative (QAR); — Surveyor; ~ Foreman, Supervisor(s). » A.Lot Plan, or the methods by which lots will be identified. » Inspection and Test Plans for the various phases during manufacture, construction and commissioning, as applicable to the project, to be submitted at least 7 days prior to commencement of relevant activity. » Acopy of the NATA Terms of Registration for the Contractor's Compliance Testing Laboratory (Internal or Sub-Contract). » Project specific operating procedures or descriptions outlining as a minimum, details of activities, who is responsible for implementation/verification, identification of relevant Quality Records and distribution and of such records, to be submitted at least 7 days prior to commencement of relevant activities. » A Register of all intended Quality Records to be used on the project, together with proformas. 1.4.4 Inspection and Test Plans Inspection and Test Plans shall contain at least the following information for each significant activity identified in the relevant process: » Description of activity; » Specification requirements/reference; » Person responsible for activity (title); » Hold Points and Witness Points; » Activity checklists; » Inspection and test type; » Tolerances or other acceptance criteria; » Identification of relevant procedure and quality records; 4142238211840 Girraween Sports Precinct 2 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.