Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= » Test/inspection frequency; » Work item or work lot identification. Inspection and Test Plans and examples of their relevant activities checklists established for this Contract shall be submitted to the Superintendent for review. Where considered necessary the Superintendent may request the Contractor to insert additional Hold Points or Witness Points. Provisions shall be made for the Contractor and Superintendent to sign off at these points. 1.4.5 Identification and Traceability All work under this Contract including manufacture, Site construction and commissioning, shall be subdivided into distinct work lots or work items. Work lots or work items shall be chosen by the Contractor, consistent with any specified requirements, but shall be subject to approval by the Superintendent. Each work lot or work item shall be assigned a unique identification number, and the Contractor shall maintain a register of all allocated work lot or work item numbers. This register shall contain, as a minimum, the following information: » Brief description of the work lot or work item; » Location reference (3 dimensional where applicable); » Lot or item status (conforming or non-conforming). The Contractor shall ensure that traceability is maintained throughout all documented records under this Contract. All test results where applicable under this Contract shall be positively identified with their respective work lot or work item number. The Contractor shall notify the Superintendent in writing 24 hours prior to commencing a new work lot or work item. 1.4.6 Conformance Reports Conformance Reports shall be prepared for each designated work lot or work item, and made available to the Superintendent on request. Conformance Reports shall include a verification statement certifying that the relevant work lots or work items have been inspected and/or tested in accordance with the Contractor's Inspection and Test Plan(s) applicable to this Contract and that they comply with the specified requirements of the Contract Documents. Conformance Reports shall be accompanied by the following documents: » All relevant signed off Inspection and Test Plans and associated Checklists; » NATA certified compliance test results (where applicable). Note: in cases where test results are not available within this period (eg. 28 day concrete strengths), the Contractor shall submit preliminary results or previous analytical data of the same mix type which statistically indicates a high probability of conformance. Submission of such information does not absolve the Contractor from its responsibilities under this Contract should actual results subsequently identify nonconformance of the work lot or work item. 41/22382/11840 Girraween Sports Precinct 3 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.