of inspection and test may be exercised. If any do not attend, then work may nevertheless proceed,
unless otherwise instructed.

Witness Points shall apply to verify compliance of the constructed works with the approved design
drawings.

Mandatory Hold Points shall include, but are not limited to, those listed below and shall apply to this
Contract to ensure compliance with the intent of the designs and with other specified requirements, and
to ensure that critical and/or irreversible activities are not constructed incorrectly.

Mandatory Hold Points:
» Subgrade inspection, after boxing out but prior to installation of the side drains,

» Pre-Seal pavement inspection (shall include inspection prior to the placement of any asphalt,
concrete or pavers);

» Reinforcement detailing (shall take place before any concrete is placed, and shall include
dowels/jointing in concrete pavements);

» Playing fields finished surface levels. Prior to commencement of the surface amelioration the
Superintendent shall inspect the works and give approval to proceed;

» On-Maintenance inspection, after works are completed;

» Off-Maintenance inspection, at the end of the 12-month defects liability period.

» Witness Points:

» Stormwater (shall take place after pipework / conduits are laid, but prior to backfilling);
Mandatory Hold Points shall apply prior to commencement of designated work lots or work items.
To obtain authorisation to proceed, the Contractor shall ensure the following:

» That all work lots or work items affected by the lot or item in question are conforming,

» That all Conformance Reports for all work lots or work items affected by the lot or item in question
have been submitted at least 24 hours prior to the tine the Contractor intends to proceed with the lot
or item in question, thus ensuring that defective works are not built-in.

Design and Construct Elements

The contract involves design and construct elements as follows:
» Irrigation system;

» Playing fields growing media remediation.

The proposed design shall be submitted to the Superintendent for approval prior to commencement of
construction.

1.4.10 Compliance Inspections and Testing

All compliance inspections and tests shall be based on work lots or work items unless otherwise

41/22382/1 1840 Girraween Sports Precinct
Earthworks Package

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1168 - Change a Development Approval [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.