Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= specified in the contract documents. The costs for all such inspections and tests shall be borne by the Contractor and included in the Contract Sum. All compliance testing shall be carried out by a NATA registered laboratory certified for the tests specified in this Contract. The Contractor shall advise the Superintendent of the work lot or work item number and the location within the lot or item, prior to any testing of the lot or item. The Contractor shall submit a Nonconformance Report and the proposed corrective action for any nonconforming test result. No further testing shall be permitted until approval by the Superintendent. For compliance inspections the Contractor shall nominate responsible persons, who are not directly involved in performing the work. The frequency of compliance testing shall be in accordance with the minimum requirements of the Contract Documents. , The Contractor shall submit to the Superintendent any preliminary results of compliance tests carried out for each work lot or work item with 24 hours of completion of tests. 1.4.11. Subcontracted Work The Contractor shall ensure that subcontracted works and procured supplies are subject to appropriate quality assurance standards when incorporated into the works in order to comply with the requirements of this Contract. If requested by the Superintendent, the Contractor shall provide evidence of appropriate quality assurance for subcontracted work or procured items incorporated into the works under this Contract. This shall include verification by the Contractor. 1.4.12 Quality Records The Contractor's quality system shall include sufficient quality records to provide objective evidence that the requirements of the Contract are met. This shall include Subcontractor's and Supplier's records relevant to this Contract. The Contractor shall, when requested by the Superintendent, provide access to all quality records relevant to the Contractor's quality system under this Contract. Within 28 days of the Date of Practical Completion, the Contractor shall forward a complete and bound clean copy of at least the following records to the Superintendent. Previously submitted documents may be selected as appropriate. » ~The Work Lot or Work Item Register for the Contract; » All Conformance and Nonconformance Reports; » All Inspection and Test Plans and associated Checklists; » All test results, analyses, reports, measurements and observations; 41/22382/11840 Girraween Sports Precinct 6 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.