Skip to the record
Accept no substitutions.

Council archive · source document

Extension of Currency Letter · 132008.175.03

of 3

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

        Page 2

                The site is included in the Attached housing zone and Open space Conservation zone
                 and the existing unit development and built form is consistent with this zoning;

                The existing development yield is consistent with the current 2006 Noosa Plan;

                Future surrounding uses would not be affected by the development of the site for
                 residential purposes;

                The development approvals are consistent with Councils intentions for the area;

                The community is well aware that the site is approved for unit development; and

                The development was recently reviewed in 2015 as part of the previous extension
                 application.


STATUTORY REQUIREMENTS:

In accordance with Section 87 of the Planning Act 2016, in assessing an extension application, the
assessment manager may:

     87(1) When assessing an extension application, the assessment manager may consider any matter that
          the assessment manager considers relevant, even if the matter was not relevant to assessing the
          development application.

ASSESSMENT:

The current development approval was assessed and granted under the superseded planning scheme
prior to the current Noosa Plan. The proposal was reviewed against the 2006 Noosa Plan provisions
under the 2011 and 2014 application for extension of the relevant period, wherein it was determined
that the development form generally was consistent with the current requirements of the Noosa Plan
and the areas of non compliance were minor. The current approval is therefore consistent with the
current laws and policies.

The proposal has also been reviewed against the Draft New Noosa Plan which includes the site in the
high Density Residential and Environmental Management and Conservation Zone. The proposal is
generally consistent with the development parameters detailed in this draft Plan.

With regard to infrastructure charges, it is noted that as part of previous changes to the approvals and
extensions, infrastructure charges for missing networks have been charged.

The current proposal is generally consistent with the current planning scheme requirements and
policies and the current conditions protect the environmental considerations of the site. The general
community is also well aware that the site has a development approval for the site. The proposed
extension is considered to meet the criteria of the Act and the applicant therefore requests an
extension of the currency period for a further four years.


This development application has been prepared in accordance with the Planning Act 2016 and is
being submitted with the following attached:
        1.        The completed Council form.
        2.        Council’s application fee of will be paid electronically.


Please contact me if you require any further information and/or clarification.

Used in these records

About this file

File size
273 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Extension of Currency Letter.pdf · 273 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.