SUPERSEDED - Negotiated Decision Notice 132008 176 05
trap. The drain outlet must be designed to prevent storm water entry to the sewerage
system.
Energy & Water Efficiency
81. All hot water systems installed shall be either solar systems; electric heat pump systems;
or gas systems (LPG or natural).
82. All new kitchen, laundry and bathroom fittings shall comply with the AAA Water
Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products
- Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage
Standard Part 1.2), or current equivalent standards as may apply, with toilets to comply
with the AAAA Water Conservation Rating System. All new tap ware and shower roses
shall not exceed a maximum flow of 9 litres per min. Dishwashers and washing machines
are excluded from this requirement.
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Schedule 10, Part 9, The agency
at DILGP Via MyDAS2 Division 4, Subdivision 1, provided its
at https://prod2.dev- Table 1 – Protection of response on 26
assess.qld.gov.au/suite State transport networks October 2023
/ (for assistance, - Development (Reference No.
contact DILGP at 5352 exceeding the threshold 22070). A copy of
9701 or in LGA2 the response is
email:SEQNorthSARA Schedule 10, Part 10, [email protected] Division 3, Subdivision 3
urrenceSARA – Development in SE Qld
Koala Habitat Area
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid.
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Qualified Person
3. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
stability for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
Page 14 of 38
Document Set ID: 23613543
Version: 2, Version Date: 04/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.