Original source · versioned page text
ENDORSEMENT OF NOOSA LOCAL DISASTER MANAGEMENT PLAN 2026 · ATTACHMENT 1 - 2026 Local Disaster Management Plan
Plans and drawings: the text below has words only, no drawings.
Section 4.3
Scenario 1: Tropical Cyclone (Category 3 - 5)
The QERMF Severe Tropical Cyclone risk assessment scenario included destructive winds, heavy rainfall
(>500 mm in 24 hours) leading to flash and moderate to major flooding and landslides. The risk assessment
included assessment of storm tide, flooding, coastal erosion, and landslide associated with the cyclone.
The determined QERMF likelihood for Scenario 1 can be found in Table 3 above.
A summary of the residual risk level for Scenario 1 can be found in Table 4 below.
Geographic vulnerability to the effects of scenario 1 modelling is illustrated in Figure 9 below.
Figure 9: Relative vulnerability of meshblock (small community level boundaries) to Scenario 1
Noosa Council 2025 | Local Disaster Management Plan Page 37 of 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.