Council archive · source document
080626 FINAL Traffic Report version 2.pdf [As Published] · 132008.1128
Blue Care Property Development Unit Blue Care Sunrise Beach
Traffic Impact Assessment
Contents
Page
1 Introduction 1
1.1 Limits of Report 1
1.2 Safety in Design 1
2 Background Information 2
2.1 Site Location 2
2.2 Existing Development 3
2.3 Local Road Network 3
3 Proposed Development 4
3.1 Proposed Access Arrangements 4
3.2 Internal Circulation and Road Hierarchy 5
3.3 Parking Provisions 7
3.4 Service Vehicle Facilities 8
4 Traffic Impact Assessment 9
4.1 Background Traffic 9
4.2 Traffic Generation 10
4.3 Traffic Distribution 12
4.4 Intersection Analysis 13
5 Conclusion 16
Appendices
Appendix A
Background Traffic Volumes
Appendix B
Generated Traffic Distribution
J:\86000\86512\66\DOCUMENTS\REPORTS\REPORT Arup
TITLE\FINAL\0002REPORT_JUNE08_V2.DOC Issue 24 June 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080626 FINAL Traffic Report version 2.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.