Skip to the record
Beware of cheap imitations.

Council archive · source document

080626 FINAL Traffic Report version 2.pdf [As Published] · 132008.1128

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Blue Care Property Development Unit                                                          Blue Care Sunrise Beach
                                                                                            Traffic Impact Assessment



       1         Introduction
                 Arup was commissioned by Blue Care in April 2008 to undertake a traffic impact
                 assessment for the proposed Blue Care Facility to be located at Grasstree Court, Sunrise
                 Beach.
                 This report details the tasks and findings associated with this assessment, which included:
                    −    Site visits to investigate the proposed development site and the surrounding road
                         network;
                    −    A review of access to the site;
                    −    A review of the internal car park layout and circulation;
                    −    An assessment of the internal servicing arrangements; and
                    −    An assessment of the impact of the site on the surrounding road network.

                 1.1         Limits of Report

                 While Arup has taken care in the preparation of this report, it neither accepts liability nor
                 responsibility whatsoever in respect of:
                    −    Any use of or reliance upon this report by any third party; and
                    −    Any third party whose interests may be affected by any decision made regarding the
                         proposed development.

                 1.2          Safety in Design

                 Within the scope of our design activities, we have identified safety in design issues and
                 potential hazards, whenever reasonably practicable within our field of expertise. Due to our
                 limited and upfront role on this project, it is not considered reasonably practicable to identify
                 all potential hazards which may occur throughout the life of a project, including during
                 construction activities. For any ensuing design stages, it is strongly recommended our
                 advice regarding safety in design be reviewed and revised as required, to reflect any
                 changes to the current design.




J:\86000\86512\66\DOCUMENTS\REPORTS\REPORT                 Page 1                                                    Arup
TITLE\FINAL\0002REPORT_JUNE08_V2.DOC                                                                 Issue   24 June 2008

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

080626 FINAL Traffic Report version 2.pdf [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.