Council archive · source document
080626 FINAL Traffic Report version 2.pdf [As Published] · 132008.1128
Blue Care Property Development Unit Blue Care Sunrise Beach
Traffic Impact Assessment
3.2 Internal Circulation and Road Hierarchy
The intent of the internal road network is to create an attractive and functional streetscape
for the ILUs. This will be achieved by creating three (3) hierarchies of roads within the site
as depicted in Figure 3.2a
Figure 3.2a – Internal Hierarchy of Roads
J:\86000\86512\66\DOCUMENTS\REPORTS\REPORT Page 5 Arup
TITLE\FINAL\0002REPORT_JUNE08_V2.DOC Issue 24 June 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080626 FINAL Traffic Report version 2.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.