07/0832 - Preliminary Building Works Assessable against the Planning Scheme - AKK Investments Pty Ltd [As Published] · 172007.832

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

INTEGRATED PLANNING ACT 1957_ ioas. MD. 20, 2 Apei 2007
Acid sulfate sails 15. The application involves development on land situated in an identified local goverment area
For mora information velet bo Guido 10, : and where the surface of the land is: (ick applicable box)
+ Unless you answered ‘none lhe hove 06, (20 below 20m AHO! and the development will involve the excavation of 1000m?er more of

 

soil or sediment at or below 5m AHD, or

 

 

nan of Natural Resouroes snd Wises
oR {D @ ator below Sm AHD and the development will invalve filling the site with 1000m° or more
teeta | ina
a
‘agency Sor the application in relation to this. &) (i) none of the above
matter,
Major hazard facilities or possible. *|6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities major hazard acity 2s defined under the Dangerous Goods Safely Management Act 2001?
For mora information refer to Guide 12. Ino
(yoy answered "YES" ta 08, the apeticaton
requires assessment by the Denatinent of - DYES - canpiete Part of Form 1
‘Emergency Servines (DES).
ite omey oir ben DES so eosarent
mmgnaga for the application, DES i
cancers apcy fro ppc
(elation to tis mater,
Water related development under the |7. The application invalves:
Water Act 2000 L10 operationat work, for taking or interfering with water under the Water Act 2000, that is:
- Sempremectenictce | 0 Ratan
Cone a indo aaa D (@) in a watercourse, lake or spring, fg. a pump, gravity dversion, stream re-cirection, weit or
tach assossment of a referable dam? darn)- complate Part Ke, Ka, Ka, Ka, or Ks of Form 1 sichsver is applicable,
Unless you answered “none of the hove" bo O7, i i -
e a re oO foran aresian bore anywere inthe Slate, no matler what Ihe use completa Part
‘Deparknonl of Netwal Resourons ond Weter '
(NRW). (© fora subartesian bore, in decared subartesian area’, or in a certain area covered

Wan agency other than NRW is the assessment by a water resource plan, for use tor purposes other than stock and/or domestic

USE - complets Pant Ks of Form ¥;

relation bo this matior. [1 @) fora subartesian bore, in certain dectared subartesian areas, for use for stock
andlor domestic purposes - complete Part Ks of Form ;

(1 (@} for taking overtand flow water in certain areas covered by a water resource plan
— completo Port Ks of Farm f,

(th) tor interfering with overland flow water in a drainage and embankment area -
complete Part Kescl Form

(1 @) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - campiele Pat Ks of Form 1; OF

(i) none of the above.

od

INTEGRATED PLANNING AGT 1997 @ ias. Checklist, Version 20,2 Apri 2007,"

Operational work that is tidal work or | 9. fe application involves operational work that is: ( ck tho applicable boxes)

morkin coset asleep C1@ tical work’ as defined under the Coasta! Protection and Management Act 1995 (the

rere ioaration about prascrbed fda work in = Coastal Act} that is not prescribed tidal work - complete Part M of Form 1; OF

focal government Gal areas refer to Gide 24. C2 dil) tidal work thatis prescribed tidal work" other than in a canal"? complete Par P of Form 1; 0%

| CO Gi caied out within a coastal management district under the Coastal Act and far - completo

Past M of Farm 1 # any boxes (a] fo) below are ticked.
[1 @ constructing or installing works in a watercourse between MHWS and HAT fia.
: a other than those works in tidal wate} where the development has been determined not

relation bb this mater. to be assessable against the Water Act 2000 ;

(1 (b) constructing a canal"? intended to be connected to tidal waters;

Ct} constructing an artificial waterway;

(21.@) rediziming tand under tidal water,

(J (e} disposing of dredge spoil or other solid waste material in tidal water;

0 @ interfering with quarry material on State coastal land above high-water mark;

(1 @) raining or allowing drainage or flow of water or other matter across Slate
coastal land above high-water mark;

(1 (h) removing or interfering with coastal dunes on tand, other than State coastal land,
thatis in an erosion prone area and above high-water mark;

[1 @ _ constructing a bank or bund wall to establish a panded pasture on land, other’
than State coastal land, above high-water mark or

= «| BG) none of the above.

 

Operational work below high water 110. The application involves operational work that is: ( tick the applicable baxfes)

mark i . (11 @ tidat work"? as defined under the Coastal Protection and Management Act 1995 (the
rao ton dl pete woh Coastal Aci) thal is not prescribed tidal work — completa Part M of Form 1; OF
“local governement Gal areas raf to Gide 24.~ (1@ Sdat work that is prescribed tidal work" - conytete Pert P of Fort f; OF

Ont eheede 1 Gi caried out within a coastal management distict'S under tha Coastal Act and for -

 

 

Removed of quamy material froma. |8. Does the application involve development for the removal of quarry material from a waleroourse®

watercourse . Fequiring an allocation notice under the Water Act 20007
«For mora information veto to Guido 18. no

Ifyou answared “YES” to O8, the application
rogpirea exscassment by tha Deparmont of (DYES - complete Parts Ks and G of Form 1

compe tho acy moey wary

 

5. Tha idontiied local povarnmrent areas ore: Aurukun, Bowen, Brisbave, Broadsound, Bundaberg, Gurdetia, Burke, Bumett, Cobooitue, Caime, Caliope, Caloundra, Carded, Carpentaria, Cook,

Codloola, Dounglas, ley, Gladsiono, Gal Comal, Harvoy Bay, Hinchinbrook, bis, Johasioe, Livngsione, Logan, Mackay, Meroochy, Mezyboraugh, Mum Vale, Mornton, Nooga, Pine River

Redcill, Redand, Rockhampton, Sarina, Touringowa, Tiara, Tarea, Townsvila, Whitsunday.

9 Watercourse is dafinod i ech 10 of toe PAL

Scena Teepe (OD arama Sefer Owe Gsposing of edge spol or other said wast material in al weter coupe Pat
Local goverment is | he ecceneen ana ,
foal prescribed del work’ - 2] oO (0) reclaiming land under tidal water - compioto Part M of Form 4; OF
(J (c) constructing a canal", if the canal is associated with reconfiguring a lot - compieta
Pat Mol Form f;

&) (iv) none of the above.
Coastal management. . 11. The application involves: fick the applicable bow’es)
For more intonation refer i Guide 18, (@  amatesiai change of use assessable under a planning scheme involving operational

Uniess you answered “none of the above" to work carried out completely or partly in a coastal management district's

[0 @ a material change of use assessable under a planning scheme /avotving building
work, carried out completely or partly in a coastat management district that is —

‘QI, the application requizes assossmoni by the
Environmental Protection Agency (EPA).
Ikan agency other than EPA ia the assessmmart

iiincndiclaicerser nies a Lk ¢ tha construction of a new premises with a GFA® of at least 1000m?
ridebon to his matter. 75 » + the enlargement of the GFA of existing premises by more than 1000m?

(1 @ reconfiguring a fot assessable under schedule 6 of the IPA where the land is situated
completely or partly in a coastal management district

(D0) reconfiguring a fot? assessable under schedule § of the IPA and in connection with
the construction of a canal"? - complete Part M of Form 1

BK] (v) none of the above

 

 

10 Tie werk is dolinedin sch 10.of be PA

11 Proscrbed ttl work is defined in the Coastal Protection wd Adarapernert Regudtion 2002 and inchudes certain Gal works complet os party wehin 3 loc goverment ta ara,

12 Canal means canal es defined under the Coastal Protectioa and Management Act 1985

19 Tidal work is defined in sch 10 of he PA

14 Prescribed txct work is daSnod is the Cosste! Protection end itanagement Regulation 2003 and includes cortan bd works completaty or pert wiia a local govammaat bial area.

15 Coesta acragorent Gebict in dened & ech 10 of fhe IPA and aware a coastal management dati! under the Coastal Protection and Management Act 1085, aber than oa area doctored 2 a
coasts management dskict under socSon 47(2) ofthat Ack

18 GFA‘s ind insch of be PA trea Bo gos fox arma Frain how casted GEA go be psig wchane apna whch a appectin og esto

4? Under 8117 ofthe Coastal Protection ard Act 1995, an whine wath fhe of en artificial waterway, mute
xsacpaodty in apatite oreionl wea Wambo tsa wary

Page 4

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0832 - Preliminary Building Works Assessable against the Planning Scheme - AKK Investments Pty Ltd [As Published].pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.