Council archive · source document
07/0832 - Preliminary Building Works Assessable against the Planning Scheme - AKK Investments Pty Ltd [As Published] · 172007.832
t
eg
INTEGRATED PLANNING ACT 1997.
Developer whi ‘the limits of a.
permanent i For
information ehout prascrbed tidal work rafar lo
Gaiido.24.
you sexed YE oO he spat
‘triggera referral to the Port Authonty, .
-moat febeeyicacnesren eer
domiopenant is—
+ wahin 200m of a shipping channel or an anty
‘and ait shipping oomidar ora pod
‘© within 1000m of a swing basin, a commarcial:
epg war asec arctan oe
. ar of pve part tity 5
*identifiod in @tand use plan approved undor
tho Transport infastrurturo Act 1904,
Inala stiaon fw Pt Auhorty on
advo agancy,
‘112. Does the application invotve development bel
@ (OAS Assessment Chacktist, Version 20, 2 Ape 2007
igh water mark" and within the limits of a port
under the Transport Infrastructure Act 19942
No
(21 YES - complete Part M of Form 1, or Past P of Form 1 ifthe work is prescribed tidal work
tfyou answored "YES" bo Q13, the application
fiasen efor seek ena ae
‘Soxviog as an advice agency.
Tal works in atrategl port land tidal
arean ‘
For mora information rafor to Guida 8!
Snags you answorad NO #0 014; (a iolevont
appicaton: Exvironmental Prosecsion
+ Agangy (EPA) and Queenstand Transpod {QT}
“}a19 eoneurtance aqancia forthe appcabon,
Heritage :
For tuthor information foro Guide 19.
ti you encwned "VES" to 015, the application:
(othe Quoonstand Hartaae
LUniecs you answored ‘nono ofthe ebows" ko
150), i eopcaton vl rfral
13. Does the apptication involve operational work that is tidal work for a marina"? with more than 6
vessel berths?
{J No
DYES . complete Part M of Form 1, or Past P of Form # ithe tidal work is proscribed tal work
14, Does the application involve tidal works within a strategic port tand tidal area???
no
(YES - complete Part M of Form ¥
15, Does the application invotve development in a heritage registered place as defined under the
Queensiand Heritage Act 1992?
&No
YES - complete Part C of Form #
15{b)The application involves: (fick applicable boxes)
@) a material change of use assessable against the planning scheme and tha tot shares a
INTEGRATED IG ACT 1997 IDAS Assessment Chockist, Version 20, 2 Apri 2007
Contaminated land 7. The application involves: (tick the appcable bawles}
‘Apelications involving material change of use (00) reconfiguring a tot tor which all of part of the premises are -
Sc omeatng tay age Bis (@) premises mentioned in the IPA, schedute 8, part 1, table 2—
For more information refer ta Guide 5, » item 5, inchiding tha exemption otherwise provided for by paragraph (d);
Unies you answered ‘none of the stow” lo
QZ, the appfication requires assessment by he
‘Envitonmental Protection Aganoy {EPA): tf an
‘agency other than EPA is the sssoxsmant ”
manage tor the application, EPA wil be a
+ item G, including tha exemption otherwise provided for by paragraph (e); or .
item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
{b) in an area far which an area management advice has been given for unexploded
ordnance - camplets Part N of Form t
COG a material change of use—
(a) mada assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if ail or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complate Part N of Form 1
1] (il) none of the above
Fanon ke hota Zot
‘IP-Reowiation.
28 an advice : comman boundary with a protected area or registered place under the Queensland
‘agony for the apphcation Heritage Act 1992;
. . (214) reconfiguring a lot if the lot shares a common boundary with a protected area or
‘; registared place under the Queensland Heritage Act 1992;
CO (i) none of the above.
&
Declared catchment aroas => -: 16. The application is in an area dectared to be a catchment area Under the Water Weter Act 2000 and
For mere intonation, induding alist the = involves: (fick the applicable baxzes)
wn CO@ reconfiguring a fot if any tot resulting from tha reconfiguration is less than 16 hectares;
‘Uniass you answored "hone Titheabow'b * C1 (i) development assessable against the planning schema Involving the establishment or
(Q16, the appboason recpires assassmont by tho expansion of a waste water disposal system, other than a disposal system for carrying
(NR. . g out an environmentally retevant activity under the Environmental Protection Act 1994;
Hn oer aber tan NRWia esas [EX (ii) none of the above
manages for the application, NRW is 9
‘concurrence agency for ha application in
ation to Bis mator, ¢
‘designating pgancy wil be a concurence
Electricity infrastructures!’ ** +) 48,
For mo¢e inforration rtor fo échodulo Zot tha IP
Begutation.
{ass you nswored ne ofthe above" a
(018, tho application biggors referral to fre
‘agangy to which the easament fs granted in.
Land d designated for community “i 19,
infrastructure:-
Ahora hig ire :
dasa kx crest ay
‘his rotor,
{you answered "YES" 10 019, tho appication
rapes esearch arco
euthartsing
to donterd rhe dpa eyo,
Rar agoncy other than the designator is be
assessment manager forthe application, the
sxpncy rh pao nea hs
The application involves: (tick the applicable boxes)
10) reconfiguring a tot where any part of the lot is -
« subject to an easement in favour of a distribution entity or transmission entity under the
Glectricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
situated within 100m of a substation site;
(1 @) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
= any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act, and
* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement,
C1 Gi) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
Ci (iv) operationat work that is filing or excavation assessable against the planning scheme,
fol associated with reconfiguring a lot, if -
© any part of the premises is subject to an easement in favour of a distribution entity or
* transmission entity under the Electriatty Act 1994 and the work is located wholly or partly in
the easement;
» the work is located wholly or party within 10m of a substation site;
BX) (¥)_ none of tha above.
Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to ba supplied by a public sector entity; and
(i) on tand not owned by or on behalf of the State; and
(iii), other than development —
(@) for the designated purpose; or
(b) carried aut by, or on behalf of, the designator.
&No
O yes
1 High wator mar is dated inthe Cosstal Protection end Managemeet Act 1995 sndimeana the ordinary tight wail mark at spring Eda,
49 Mrina is dotined in the Transport Operations (Marthow PolkGon) Regpdstion 1
2 Stetagic port tact tidal araaa aro te arwaa ganaraly 50 matres seaward of high water mask edfacent b stetoge portland.
Paga 5 Pages
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0832 - Preliminary Building Works Assessable against the Planning Scheme - AKK Investments Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.