ATTCH 7 - IR Response - Engineering (Sheehy & Partners)
Attached to the e-mail RAL17/0501 IR Response email 4 of 4.
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
1.50
·
·
·
· 1.46
1.62
1.43
1.46
FL/
SIGN/
SIGN/
CONSULT AUSTRALIA
Member Firm
[OCR of page images]
CAD FILE->N\@500di\853I\ACAD\PLANNING\8531-J.dwg
PLOT DATE-> 10 Nov, 2017-6:5pm
LEGEND
NORM - DAY
MEAN - DAY
TRUCK - DAY (70kph)
SAFE INTERSECTION SIGHT DISTANCE - NORTH
EDD-SISD 8.40%
85th % SPEED 70 80 EYE AND OBJECT HEIGHT
oT RT d | algrade) REQUIREMENTS (m)
MEAN SPEED 595 68
NORM DAY 15 2 046 | 8.40 109.9 1325 1.10 125
MEAN DAY 17 2 ont | 8.40 95.1 114.2 1.10 125
TRUCK DAY 15 2 029 8.40 Bbk 164.4 2.40 0.80
SAFE INTERSECTION SIGHT DISTANCE - SOUTH
EDD-SISD ~4.10%
85th % SPEED 70 80 EYE AND OBJECT HEIGHT
or RT d | algrade) REQUIREMENTS (m)
MEAN SPEED 595 68
NORM DAY 15 2 0.46 8.40 110.0 132.6 1.10 1.25
MEAN DAY 7 2 out | 8.40 95.2 1143 1.10 125
TRUCK DAY 15 2 029 | 8.40 134.7 164.8 2.40 0.80
NOTE:
© THE LONGITUDINAL GRADE HAS BEEN MEASURED 100m FROM THE INTERSECTING ROAD,
WITH THE EXISTING RL'S AND THE AVERAGE GRADE FOR THE LENGTH UTILISED.
* MINOR ROAD - MEASURE FROM 5m (OR MIN. 3m) BACK FROM EDGE OF CARRIAGEWAY
© — MAJOR ROAD (NORTHERN APPROACH) - MEASURED ALONG CENTRE LINE OF SOUTHBOUND LANE.
© — MAJOR ROAD (SOUTHERN APPROACH) - MEASURED ALONG CENTRE LINE OF NORTHBOUND LANE.
— 110.967
LAYOUT PLAN
0 1 0
SCALE pee 1500 (A1)
SURVEYOR: CLIENT: PROJECT: “SCALES: AS SHO! DRAWING NUMBER:
Teena cocae ae See PLANNING
isan nore 2 DAVID LOW WAY, COKE. PM PARTNERS 8531-J
KENLYNN PTY LTD aa e acerba rests SAFE INTERSECTION SIGHT DISTANCE
SOLER N PART WITHOUT 3 [TRUCK #0km/h SIGHT LINE REMOVED Nov [RT Yorawn sb GONSULTING ENGINEERS FULL SIZE At
WRITTEN PERMISSION OF SHEEHY CASTAWAYS BEACH 2 [DRIVEWAY REVISED Nov [RT 7 —DW STRUCTURAL AND_CIVIL LAYOUT PLAN 2/3] | | |
Tee ere coe oa 1 | TRUCK DAY SISD ADDED ocr | sep CHECKED Firm HGT)BED9 Seee FaN(O7}898 S659
"AMENDMENTS DATE | INITIALS | DATE: JUNE ‘17 A.C.N.009 899 905 No. OF DRAWINGS:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.