Skip to the record
The only place to find full transcripts.

Original source · versioned page text

ATTCH 7 - IR Response - Engineering (Sheehy & Partners)

Attached to the e-mail RAL17/0501 IR Response email 4 of 4.

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                  1.50




·

·
·
·                        1.46




                                1.62
           1.43
    1.46




                                               FL/




                                                                         SIGN/
                                       SIGN/




                                                     CONSULT AUSTRALIA



                                                        Member Firm


[OCR of page images]
 

CAD FILE->N\@500di\853I\ACAD\PLANNING\8531-J.dwg

PLOT DATE-> 10 Nov, 2017-6:5pm

LEGEND

NORM - DAY
MEAN - DAY

TRUCK - DAY (70kph)

SAFE INTERSECTION SIGHT DISTANCE - NORTH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EDD-SISD 8.40%
85th % SPEED 70 80 EYE AND OBJECT HEIGHT
oT RT d | algrade) REQUIREMENTS (m)
MEAN SPEED 595 68
NORM DAY 15 2 046 | 8.40 109.9 1325 1.10 125
MEAN DAY 17 2 ont | 8.40 95.1 114.2 1.10 125
TRUCK DAY 15 2 029 8.40 Bbk 164.4 2.40 0.80
SAFE INTERSECTION SIGHT DISTANCE - SOUTH
EDD-SISD ~4.10%
85th % SPEED 70 80 EYE AND OBJECT HEIGHT
or RT d | algrade) REQUIREMENTS (m)
MEAN SPEED 595 68
NORM DAY 15 2 0.46 8.40 110.0 132.6 1.10 1.25
MEAN DAY 7 2 out | 8.40 95.2 1143 1.10 125
TRUCK DAY 15 2 029 | 8.40 134.7 164.8 2.40 0.80
NOTE:

© THE LONGITUDINAL GRADE HAS BEEN MEASURED 100m FROM THE INTERSECTING ROAD,
WITH THE EXISTING RL'S AND THE AVERAGE GRADE FOR THE LENGTH UTILISED.

* MINOR ROAD - MEASURE FROM 5m (OR MIN. 3m) BACK FROM EDGE OF CARRIAGEWAY

© — MAJOR ROAD (NORTHERN APPROACH) - MEASURED ALONG CENTRE LINE OF SOUTHBOUND LANE.

© — MAJOR ROAD (SOUTHERN APPROACH) - MEASURED ALONG CENTRE LINE OF NORTHBOUND LANE.

 

— 110.967

LAYOUT PLAN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0 1 0
SCALE pee 1500 (A1)

SURVEYOR: CLIENT: PROJECT: “SCALES: AS SHO! DRAWING NUMBER:
Teena cocae ae See PLANNING
isan nore 2 DAVID LOW WAY, COKE. PM PARTNERS 8531-J

KENLYNN PTY LTD aa e acerba rests SAFE INTERSECTION SIGHT DISTANCE
SOLER N PART WITHOUT 3 [TRUCK #0km/h SIGHT LINE REMOVED Nov [RT Yorawn sb GONSULTING ENGINEERS FULL SIZE At
WRITTEN PERMISSION OF SHEEHY CASTAWAYS BEACH 2 [DRIVEWAY REVISED Nov [RT 7 —DW STRUCTURAL AND_CIVIL LAYOUT PLAN 2/3] | | |
Tee ere coe oa 1 | TRUCK DAY SISD ADDED ocr | sep CHECKED Firm HGT)BED9 Seee FaN(O7}898 S659
"AMENDMENTS DATE | INITIALS | DATE: JUNE ‘17 A.C.N.009 899 905 No. OF DRAWINGS:

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

ATTCH 7 - IR Response - Engineering (Sheehy & Partners).pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.