Original source · versioned page text
ATTCH 7 - IR Response - Engineering (Sheehy & Partners)
Attached to the e-mail RAL17/0501 IR Response email 4 of 4.
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
CONSULT AUSTRALIA
Member Firm
[OCR of page images]
CAD FILE->N-\8S00dir\ 8531\ ACAD\PLANNING\853-K.dwg
DESIGN SURFACE
PLOT DATE-> 10 Nov, 2017-5:I7pm
(PROPOSED DRIVEWAY) u e
ze
EXISITNG RETAINNG WALL TO
BE ADJUSTED
=
Sl-
we
we
STRIP EXISTING SURFACE. a
(70mm Approx.)
DESIGN SURFACE
(PROPOSED DRIVEWAY)
lL 128.059 133.217 |
NORMAL DAY - SAFE INTERSECTION SIGHT DISTANCE NORMAL DAY - SAFE INTERSECTION SIGHT DISTANCE
(CAR 80KM/H NORTHERN APPROACH) (CAR 80KM/H SOUTHERN APPROACH)
0 05 10 15 2.0 2.5m 450 VERTICAL (A1) 0 05 1.0 15 2.0 2.5m 150 VERTICAL (A1)
SCALES SCALES
0 10 20 30 40 50m 1:500 HORIZONTAL (A1) @ 10 20 30 40 50m 1:500 HORIZONTAL (A1)
——— DATUMR L000
——— DATUM Ries 000
© crn ‘SURVEYOR CLIENT: PROJECT: SCALES: AS SHOWN PLANNING DRAWING NUMBER:
THE INFORMATION CONTAINED W DESIGNED: SB , aN
spac Moras KENLYNN PTY LTD 2 DAVID LOW WAY, CHECKED: PM | CONSULT AUSTRALIA SISD - NORMAL DAY 8531-K
COPYING OF THI DOCUMENT
; FULL SIZE Al
MITTEN PERMISSION OF SHEEHY CASTAWAYS BEACH 2 |SIGHT LINES REVISED Nov'17 | RT ee = — i STRUTURAL OND ENE CAR LONGITUDINAL 1] 2] [ [ [ [
IPRNCENENT OF COPYRIGHT. 1 [DRIVEWAY REVISED Nov" 17|_ RT - Firm SECTIONS
AMENDMENTS DATE_[iniTiacs J DATE: JUNE ‘17 No. OF DRAWINGS:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.