ATTCH 7 - IR Response - Engineering (Sheehy & Partners)
Attached to the e-mail RAL17/0501 IR Response email 4 of 4.
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
8531 Information Required 15. Modify the proposed vertical alignment of the proposed access to David Low Way, to satisfy the grading requirements of AS/NZS 2890.1-2004, particularly in achieving satisfactory grades across the verge and on the approaches to the existing pedestrian / cycle path from both directions on the driveway (as vehicles using the driveway will need to give way to pedestrians / cyclists on that path). The proposed alterations to the existing vertical alignment of the existing path should also be identified. : Response: The access grading is shown on Longitudinal Section 8531-R rev2. The grading requirements in AS 2890.1:2004 are as follows: “AS2890.1 2004 2.6.2 Gradients The maximum gradient of domestic driveways shall be 1 in 4 (25%). The maximum gradient of the associated access driveway across a property line or building alignment shall be 1 in 20 (5%) and across a footpath as specified in Clause 3.3(d). 3.3 GRADIENTS OF ACCESS DRIVEWAYS At entry and exit points, the access driveway should be graded to minimize problems associated with crossing the footpath and entering the traffic in the frontage road. Maximum gradients on and near access driveways, other than at domestic properties (see Clause 2.6), shall be as follows: (d) Across footpaths—where the driveway crosses a footpath, the driveway grade shall be 1 in 40 (2.5%) or less across the footpath over a lateral distance of at least 1.0 m.” The proposed grading of the driveway does not exceed 25% with a maximum 20% adopted near David Low Way to minimise the vertical realignment of the footpath and no greater than 16% on the remaining access driveway. Across the footpath a gradient of 2.5% has been incorporated to satisfy clause 3.3(d) of 2890.1:2004 with a 3% cross fall extended from the existing David Low Way for the width of the left turn lane. The existing shared footpath / cycleway generally follows the vertical alignment of the adjacent David Low Way and has been realigned and regraded to suit the proposed access to the development. Figure 1 below shows the proposed grading of the shared footpath / cycleway on the approaches to the new access. The gradients on the approaches does not exceed 6.205% (1:16). AS 1428.2:1992 suggests that rest points should be provided at 9m spacings for gradients of 1:14 and 15m for gradients of 1:20 with values interpolated in between. As the proposed gradient is 1:16 on the northern approach, the suggested spacing would be 10m. The proposed regrading of the ramp on the north side of the access is 9m in length. It is therefore proposed that the driveway access (2.5%) provides a suitable rest area within the 10m requirement and 8/11/2017 2| Pa
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.