Skip to the record
Accept no imitations.

Original source · versioned page text

ATTCH 7 - IR Response - Engineering (Sheehy & Partners)

Attached to the e-mail RAL17/0501 IR Response email 4 of 4.

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

              1.50




                            1.62




                     1.46
       1.43
1.46




                                           FL/




                                                                     SIGN/
                                   SIGN/




                                                 CONSULT AUSTRALIA



                                                    Member Firm


[OCR of page images]
CAD FILE->N\@500di\853INACAD\PLANNING\853I-A dwa

PLOT DATE-> 06 Nov, 2017-4.40pm

 

LEGEND

STAGE BOUNDARY

 

 

 

 

 

 

‘Sw PROPOSED STORMWATER
— — SwD — — EXISTING STORMWATER
s PROPOSED SEWER
—— — S— — EXISTING SEWER
— — RM— — EXISTING SEWER RISING MAIN (TRACED)
Ws PROPOSED WATER

EXISTING WATER (TRACED)
—— E0/H — — _ EXISTING OVERHEAD ELECTRICAL
VEGETATION LINE

ss PROPOSED PAVEMENT

 

 

Y
\

ht 7

4

=A

 
 
 
    

 

 

 

 

  

 
 
   
   
   
 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4
RE-ALIGN EXISTING FOOTPATH
i
! SEWER LIVE WORK CONNECTION
-—-P-~;_
~
Sf _ ~S
~
7
EXISTING SERVICE BAY 22.334m EXISTING RETAINING WALL TO BE
TO BE RECONSTRUCTED ADJUSTED TO SUIT SAFE INTERSECTION
EXISTING STORMWATER GULLY PITS TO SUIT ROAD WIDENING SIGHT DISTANCE REQUIREMENTS

PROPOSED STORMWATER ae IDEAING RELOCATED TO SUIT

DISCHARGE AND CULVERT

BENEATH DRIVEWAY

PROPOSED BAR TREATMENT
WATER LIVE WORKS CONNECTION ROAD WIDENING
LAYOUT PLAN
o 10 15-20 25
SCALE ™ 4500 (At)
: , DRAWING NUMBER:
© commen SURVEYOR: CENT PROIEST: ——e ~*~ Se PLANNING
THE NFORMATION CONTAINED IN DESIGNED: SB _
reer aca KENLYNN PTY LD 2 DAVID LOW WAY, ceca, PH | concucr aust atin AmPARTNERS 8531-A
Pry CIMITEO

COPYING OF THIS DOCUMENT IN 3 [DRIVEWAY REVISED. Nov'17 | RT| pRAWN: SB CONSULTING ENGINEERS FULL SIZE At
MITTEN PERMISSION OF SHEEHY CASTAWAYS BEACH 2 [DRIVEWAY REVISED AND TURNAROUND ADDED | ocT ‘17 | SB Veheckep. pm — i STRUCTURAL AND CIVIL GENERAL LAYOUT AND SERVICES PLAN 1 2] 3] l l l
ANO PARTNERS CONSTITUTES AN + ISEWER PIT LABELS ADDED wuLY a} SB Firm PHO7)SES9 3644 FAK(O) SEBO 3655
INFRINGEMENT OF COPYRIGHT "AMENDMENTS DATE [INTIALS| DATE: JUNE “17 A.C.N.009 899 905 No. OF DRAWINGS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

ATTCH 7 - IR Response - Engineering (Sheehy & Partners).pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.