Original source · versioned page text
ATTCH 7 - IR Response - Engineering (Sheehy & Partners)
Attached to the e-mail RAL17/0501 IR Response email 4 of 4.
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
e 8531-A e 8531-B e §8531-C e 8531-D e 8531-E e 8531-H e 8531-J e §8531-K e §8531-L e 8531-M e §=8531-N e 8531-0 8531 General Layout and Services Plan Bulk Earthworks Layout Plan Bulk Earthworks Graduation Layout Plan Bulk Earthworks Site Sections Driveway Longitudinal Section Sewer Reticulation Longitudinal Section Safe Intersection Sight Distance Layout Plan Safe Intersection Sight Distance Normal Day Car Longitudinal Sections Safe Intersection Sight Distance Truck Day Longitudinal Sections David Low Way Cross Sections (Sheet 1 of 2) David Low Way Cross Sections (Sheet 2 of 2) Driveway Access Truck Swept Path Should you require any further information in relation to this matter, please do not hesitate to contact Mr Brian Mortimore of our office. Yours faithfully / é WA bas B Mortimore for and on behalf of SHEEHY & PARTNERS PTY LTD Consulting Engineers 8/11/2017 5|Page
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.