Council archive · source document
Decision Notice DBW25 0118 · DBW25/0118
Currency Period
2. This development approval lapses if the use has not happened by 3 October 2027 unless
an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
DA01 A Proposed Site Setbacks & Landslide 25/08/2025
Overlay, prepared by Adrian Ramsay
Design House
DA02 A Proposed Site Plan, prepared by Adrian 25/08/2025
Ramsay Design House
DA05 A General Arrangement Floor Plan – Lower 25/08/2025
Ground, prepared by Adrian Ramsay
Design House
DA06 A General Arrangement Floor Plan – Ground, 25/08/2025
prepared by Adrian Ramsay Design House
DA07 A Proposed Roof Plan, prepared by Adrian 25/08/2025
Ramsay Design House
DA08 A 8m Offset Roof Height Blanket Overlay, 25/08/2025
prepared by Adrian Ramsay Design House
DA09 A Proposed Elevations, prepared by Adrian 25/08/2025
Ramsay Design House
DA10 A Proposed Elevations Sheet 2 of 2, prepared 25/08/2025
by Adrian Ramsay Design House
DA11 A Proposed Elevations, prepared by Adrian 25/08/2025
Ramsay Design House
DA12 A Proposed Sections Sheet 1 of 4, prepared 25/08/2025
by Adrian Ramsay Design House
DA13 A Proposed Sections Sheet 2 of 4, prepared 25/08/2025
by Adrian Ramsay Design House
DA14 A Proposed Sections Sheet 3 of 4, prepared 25/08/2025
by Adrian Ramsay Design House
DA15 A Proposed Sections Sheet 4 of 4, prepared 25/08/2025
by Adrian Ramsay Design House
Page 2 of 7
Document Set ID: 24199509
Version: 4, Version Date: 08/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice DBW25 0118.pdfRelated documentApplication case desk ↗
About this file
- File size
- 156 KB (small file)
- File type
No other editions are linked here.