2017-05-09 Planning & Environment Committee Agenda

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 MAY 2017


                  o     New projects not previously contained in the current PIP are for the new
                        hinterland playground in Cooroy, the Rufous Street development and the
                        Chaplin Park Precinct Master Plan. These have been included in the new
                        LGIP due to recent/current planning reports and Council approvals.
                  o     The Noosa Leisure Centre has been updated to include the Library and
                        Wallace Park which now relates to both Community Land and Recreation
                        Park purposes. Staff have reviewed the previous “Wallace Park Master
                        Plan Review Draft Report dated 20 February 2013” prepared under the
                        Sunshine Coast Regional Council and whilst this report was only issued as
                        a draft, staff consider elements relating to Stage 1 of the plan as being a
                        suitable basis for updating the proposed future works for the LGIP
                        summarised as page 2 of Attachment 2.
                        Stage 2 of the draft plan has not been considered appropriate for this LGIP
                        due to the high cost estimate and subject to external funding being
                        available. This will be determined by new planning that is currently
                        underway for the new planning scheme and its LGIP.
                  The estimated timing for provision of the proposed future items have been
                  reviewed with:
                  o     items already been completed as listed in the 2014-2016 time cohort;
                  o     projects allocated to the 2016-2021 time period aligned with Council’s 5
                        year Cap X program; and
                  o     the remaining future projects allocated to the later time cohorts 2021-2026
                        and 2026-2031 as considered appropriate for an acceptable budget cost
                        allocation per year. Council does not currently have a 10 year or longer
                        term Cap X program available as this is also currently being developed.
                Staff review comments
                  This advises the particular method basis used to determine the LGIP base cost
                  estimates. Items not based on indexed PIP costs have also been highlighted in
                  red font for ease of identification.
                Contingency
                  The LGIP base cost estimates have been adjusted to include the contingency
                  allowable under the guideline according to the project’s estimated timing.
                Resulting items for SOW table (columns 1 to 4)
                  This provides the basis for formalising the SOW Table required for the LGIP
                  however may be further refined following completion of the excel SOW model as
                  briefly explained in section iii below. The final draft LGIP will be provided for
                  Council’s review and approval prior to proceeding to the State review.
iii.   Schedule of Works (SOW) Model
       The SOW model is an excel based spreadsheet model that must be prepared in accordance
       with the SOW User Manual included in Appendix C of the Statutory Guideline. The State
       Department of Infrastructure, Local Government and Planning has provided the model for
       local government use in the preparation of the LGIP.
       Full details and requirements of the model was previously detailed to Council in the Planning
       & Environment Committee Meeting Report of 12 July 2016.




                                                                                      Page 6 of 29
Log in to download the original file

2017-05-09 Planning & Environment Committee Agenda(PDF, 2MB).pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.