Bushfire Hazard Assessment & Management Plan v4 - 7 Triller Court, Pomona

Attached to the e-mail RAL21/0022 - 7 Triller Court_ Pomona - Response to Further Advice Matters & Change to app (1 Lot into 4).

of 47

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Bushfire Hazard Assessment & Management Plan v4                                        NCES REF: J000841
Lot 4 on SP320405 – 7 Triller Court, Pomona


3.3    Potential Bushfire Intensity classes
Table 1 details the Potential Bushfire Intensity classes and their corresponding potential fire-line
intensity (KW/m) values as prescribed within Leonard et. al. 2017.
Table 1: Potential Bushfire Intensity classes




3.4    Bushfire Hazard Sub-Units
A sub-unit level Local Hazard Area Map has been prepared; Plan No. BF02 – Sub-Units and
identifies the site scale Potential Bushfire Intensity classes across the site. The sub-unit level Local
Hazard Area Map identifies that the offsite VHC 9.1 vegetation contains a Medium and High Potential
Bushfire Intensity area.

3.5    Overall Local Hazard Map
An overall Local Hazard Map has been prepared; Plan No. BF03 – Local Hazard Map and identifies
the Potential Bushfire Intensity classes across the site as well as associated 100m wide Potential
Impact Buffer areas. Areas mapped as containing a Medium and High Potential Bushfire Intensity
area associated with the VHC 9.1 exist outside of the site to the north, west, and south. A subsequent
Potential Impact Buffer Area has been identified extending across the site. The Local Hazard Map
presented in Plan No. BF03 is to supersede the SPP broadscale mapping attributed to the site and
should be used to guide the formulation of appropriate site-based bushfire management measures
for the proposal.




© 2023                                             12
Log in to download the original file

Bushfire Hazard Assessment & Management Plan v4 - 7 Triller Court, Pomona.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.