Bushfire Hazard Assessment & Management Plan v4                                NCES REF: J000841
Lot 4 on SP320405 – 7 Triller Court, Pomona



5    BUSHFIRE IMPACT REDUCTION MEASURES

5.1 General
The following section describes bushfire impact reduction measures to be incorporated into
the proposed development to reduce the risk of bushfire impacts to people and property.
Implementation of the identified measures is not implied nor intended to advocate that building
occupants remain on the site during a bushfire event, nor that people and property will be
protected from bushfire impacts. The measures are intended to reduce the potential severity
of bushfire impact to the development and not prevent bushfire impact. The bushfire mitigation
measures have been derived from:
    •    Department of State Development, Manufacturing, Infrastructure and Planning’s State
         Planning Policy – State interest guidance material – Natural hazards, risk and
         resilience – Bushfire (December 2019) (referenced herein as SPP (Bushfire) 2019);
         and
    •    Queensland Fire and Emergency Services. (2019). Planning for Bushfire Resilient
         Communities.

5.2 Asset Protection Zones
5.2.1    General
Asset Protection Zones (APZ) provide a defensive tool to assist in the reduction of potential
bushfire impact to people and property situated in bushfire prone areas. For illustrative
purposes, Plate 13 depicts the concept of an APZ surrounding a dwelling in a bushfire prone
areas.




                                      Plate 13 – Asset Protection Zones

The development has been confirmed to be located within a bushfire hazard area hence
provision of adequate separation between the building envelopes nominated immediately
flanking the hazardous vegetation is required to provide a reasonable level of safety to site
occupants and emergency services staff.
The specific requirements for the dimensions of APZ’s are set in theState Planning Policy –
State Interest Guidance Material (Natural Hazards, Risks and Resilience – Bushfire)
December 2019.

5.2.2    State Planning Policy – State Interest Guidance Material (Natural Hazards, Risks
         and Resilience – Bushfire) December 2019
Assessment Benchmark 4 of the State Planning Policy – state interest guidance material
states:
Development supports, and does not hinder, disaster management response or recovery
capacity or capabilities.
Where reconfiguring a lot creating lots of greater than 2000 square metres (only applicable to
Lot 7):


© 2023                                                   21
Log in to download the original file

Bushfire Hazard Assessment & Management Plan v4 - 7 Triller Court, Pomona.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.