Original source · versioned page text
Bushfire Hazard Assessment & Management Plan v4 - 7 Triller Court, Pomona
Attached to the e-mail RAL21/0022 - 7 Triller Court_ Pomona - Response to Further Advice Matters & Change to app (1 Lot into 4).
Plans and drawings: the text below has words only, no drawings.
Bushfire Hazard Assessment & Management Plan v4 NCES REF: J000841 Lot 4 on SP320405 – 7 Triller Court, Pomona 5 BUSHFIRE IMPACT REDUCTION MEASURES 5.1 General The following section describes bushfire impact reduction measures to be incorporated into the proposed development to reduce the risk of bushfire impacts to people and property. Implementation of the identified measures is not implied nor intended to advocate that building occupants remain on the site during a bushfire event, nor that people and property will be protected from bushfire impacts. The measures are intended to reduce the potential severity of bushfire impact to the development and not prevent bushfire impact. The bushfire mitigation measures have been derived from: • Department of State Development, Manufacturing, Infrastructure and Planning’s State Planning Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December 2019) (referenced herein as SPP (Bushfire) 2019); and • Queensland Fire and Emergency Services. (2019). Planning for Bushfire Resilient Communities. 5.2 Asset Protection Zones 5.2.1 General Asset Protection Zones (APZ) provide a defensive tool to assist in the reduction of potential bushfire impact to people and property situated in bushfire prone areas. For illustrative purposes, Plate 13 depicts the concept of an APZ surrounding a dwelling in a bushfire prone areas. Plate 13 – Asset Protection Zones The development has been confirmed to be located within a bushfire hazard area hence provision of adequate separation between the building envelopes nominated immediately flanking the hazardous vegetation is required to provide a reasonable level of safety to site occupants and emergency services staff. The specific requirements for the dimensions of APZ’s are set in theState Planning Policy – State Interest Guidance Material (Natural Hazards, Risks and Resilience – Bushfire) December 2019. 5.2.2 State Planning Policy – State Interest Guidance Material (Natural Hazards, Risks and Resilience – Bushfire) December 2019 Assessment Benchmark 4 of the State Planning Policy – state interest guidance material states: Development supports, and does not hinder, disaster management response or recovery capacity or capabilities. Where reconfiguring a lot creating lots of greater than 2000 square metres (only applicable to Lot 7): © 2023 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.