SPA Decision Notice - 010.2010.00000100.001 [As Published] · MCU11/0053
2010/100
Unitywater
Water & Sewerage
44. Reticulated sewerage must be provided to the development with a single sewerage
connection to serve both dwellings on the Lot.
45. Buildings and structures must maintain a minimum 1.0 metre clearance from the Council
sewer inspection opening.
46. Storm water retention systems and gross pollutant traps must maintain a minimum clearance
of 1.5 metres from Council sewerage infrastructure.
47. Separate 25mm PE water services must be installed to a common lot boundary with
independent meters installed outside the boundary of the lot in accordance with Sunshine
Coast Water Standard Drawing SCW 361. The existing 20mm water service must be
disconnected.
48. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Council’s
water mains and 1.5 metres from Council sewerage infrastructure. Landscaping plants within
these clearances must be low growing when mature and suitable approved varieties.
49. Construction works undertaken in the vicinity of Council water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
5 REFERRAL AGENCY CONDITIONS
Not applicable.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Issue. Plan / Document Name Date
Sheet 1 of 5 A Carparks – Eco Cottages 8 July 2010
Sheet 2 of 5 Floor Plan Existing Conditions – Eco Cottages 19 May 2010
Sheet 3 of 5 Floor Plan Proposed– Eco Cottages 19 May 2010
Sheet 4 of 5 Proposed Single Storey Residence – Eco 19 May 2010
Cottages
Sheet 5 of 5 Elevations – Eco Cottages 19 May 2010
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77 (1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
2. The development should be undertaken in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
Page 8 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice - 010.2010.00000100.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 79 KB (small file)
- File type
No other editions are linked here.