Original source · versioned page text
DESTINATION MANAGEMENT PLAN - PHASE 2 ENGAGEMENT · Attachment 2 - Phase 2 Draft DMP Engagement and Communications Summary_For Council Report
Plans and drawings: the text below has words only, no drawings.
Phase 2 Engagement As part of the wider DMP development, this second phase of engagement is to test whether the community values and feedback that was heard in phase 1 of engagement has been reflected in the draft DMP, in particular the, four strategic directions (principles) and associated actions. This will be done by: • Delivering a clear, innovative strategic comms campaign to reintroduce the project back to the community. • Explaining the draft DMP approach and actions and • Inviting the community to engage and provide their feedback on the draft DMP. Engaging and informing all stakeholders including business groups, tourism industry, community and environment groups to ensure wide distribution and demographic response. To facilitate greater participatory engagement (where everyone can have a say) the engagement methodology includes a diverse range of engagement methods for the community to choose how they would prefer to provide their input. To facilitate greater insight into how the broader community feels (i.e beyond people who may be already engaged, have an existing position or who are in the most highly sampled age groups in the Shire), Council will test demographically and statistically significant engagement methods through piloting a representative Community Panel. This will enable Council to compare and contrast participatory feedback (Your Say survey open to all) with Community Panel feedback (demographically and statistically representative) to determine how the broader community feels about a draft DMP and have the confidence to make decisions based on evidence-based community engagement data.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original