2022-09-12 General Committee Meeting Agenda

of 85

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                        12 SEPTEMBER 2022


             Performance Bond
       16.   Security in the form of a cash bond or trading bank guarantee to the sum of
             $10,000 must be submitted to Council, to secure performance of all conditions of
             this approval, prior to the issue of a Development Permit for Operational Works.
             The cash bond or trading bank guarantee will be returned on performance of the
             conditions of approval less any costs incurred by Council in respect of enforcing
             performance of this permit. Council reserves the right to call upon the bond or
             guaranteed sum to effect compliance with conditions.
             Street Identification
       17.   The street address of the development must be clearly visible and discernible
             from the primary frontage of the site by the provision of a street number and,
             where appropriate, the building name.
             External Works – Wimmers Lane
       18.   Wimmers Lane must be upgraded for the length of its frontage to the subject site.
             The works must be undertaken in accordance with an Operational Works
             approval and must include in particular:
             a.    construction of kerb and channelling, road widening and underground
                   stormwater drainage to the development side only. The final extent and
                   alignment of works to be determined as part of the subsequent Operational
                   Works approval.
             Road Widening of Wimmers Lane
       19.   The developer must dedicate as “road” a 2m wide strip extending across the full
             frontage of the site to Wimmers Lane. The dedication must be in accordance with
             drawing number Plan number SK01 Version G dated 23 August 2022 prepared
             by Wiltshire Stevens Architecture.
       20.   The dedication must be completed prior to the commencement of the use.
             External Works – Emerald Street
       21.   Emerald Street must be upgraded for the length of its frontage to the subject site.
             The works must be undertaken in accordance with an Operational Works
             approval and must include in particular:
             a.    a full width pathway extending from the property boundary to the kerb and
                   channel.
             b.    works to transition the new full width pathway to match smoothly with the
                   existing frontages of the adjoining properties. These works will extend
                   beyond the frontage of the subject site. The transitions must be constructed
                   at grades that are in accordance with Council’s Planning Scheme Policy 5
                   – Engineering Design Standards – Roads, Drainage and Earthworks.
             c.    any necessary relocation or alteration to existing access from Emerald
                   Street to the adjoining property at 4 Emerald Street must be undertaken.
                   The type and extent of these works must be in agreement with the adjoining
                   property owner and clearly shown on plans submitted for operational
                   works.
             d.    Any relocation/reinstatement of existing services in the road verge.
             These works are to be undertaken at no cost to Council.
             Site Access and Driveways
       22.   A sealed access driveway must be provided from Wimmers Lane to all parking
             and manoeuvring areas of the development. The works must be undertaken in

                                                                                Page 12 of 85
Log in to download the original file

2022-09-12 General Committee Meeting Agenda(PDF, 12MB).pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.