Skip to the record
Accept no substitutions.

Original source · versioned page text

2022-09-12 General Committee Meeting Agenda

of 85

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                         12 SEPTEMBER 2022


            while the use continues.
       2.   The applicant must provide a copy of the development approval to the private
            building certifier who assesses the subsequent development application for a
            development permit for building works for the construction of the Detached
            House and the associated deck and pool area.
            Approved Plans
       3.   Development must be undertaken strictly under the approved plans listed in the
            following table unless otherwise amended by these conditions.
             Plan No.    Rev.    Plan/Document Name                              Date
             100.00       J      Site Plan, prepared by Shaun Lockyer            01.09.2022
                                 Architects
             200.00        J     Floor Plan – Lower Ground                       01.09.2022
             200.01        I     Floor Plan – Ground Level                       01.09.2022
             200.02        H     Floor Plan – Level 01                           01.09.2022
             210.00        H     Roof Plan                                       01.09.2022
             300.00        H     Building Elevations – elevation west            01.09.2022
             300.01        H     Building Elevations – elevation north           01.09.2022
             300.02        H     Building Elevations – elevation east            01.09.2022
             300.03        H     Building Elevations – elevation south           01.09.2022
             640.00        A     Landscape details – detail driveway plan        06.05.2022
             640.01        A     Landscape details – driveway detail section     06.05.2022
            Amended Plans
       4.   Prior to the issue of any further development approvals amended plans must be
            submitted to Council. The plans must remove the roof top terrace. The plans
            must be to the satisfaction of the Manager, Development Assessment.
            Approved Documents
       5.   Development must be undertaken strictly under the approved documents listed
            in the following table unless otherwise amended by these conditions.
             Document
                Tectonic report “Geotechnical Investigation, Proposed residence 66 Seaview
                 Terrace, Sunshine Beach”, reference 21370-001-Rev 1 dated 28 April 2022
                Royal Haskoing DHV report ‘Report 66 Seaview Terrace, Sunshine Beach Coastal
                 Hazards Assessment, reference PA2906-RHD-ZZ-XX-RP-Z-0001 dated 3 June
                 2022

            Built form
       6.   The maximum height of the development must not exceed 8 metres above
            ground level in accordance with the approved plans.
       7.   Certification must be submitted to Council from a Licensed Surveyor which
            certifies that the building does not exceed the maximum height requirement of
            this Decision Notice.
       8.   The proposed Detached House must be located on the site, as shown on the Site
            Plan, Drawing No. 100.00, Revision J. The Detached House is not to be located
            closer than 10.5m to the seaward boundary, except for the cantilevered part of
            the building which is not to extend closer than 7.5m to the seaward boundary.
            Certification of the location of the Detached House, including the cantilevered
            section from the seaward boundary, is to be provided by a licenced surveyor
            before the issue of a final classification for the Detached House by the building
            certifier. The certification must be submitted to Council.


                                                                                 Page 16 of 85
Log in to download the original file

2022-09-12 General Committee Meeting Agenda(PDF, 12MB).pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.