2022-09-12 General Committee Meeting Agenda

of 85

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                       12 SEPTEMBER 2022


             Currency Period
       9.    This development approval lapses if the use has not happened by 21 July 2028,
             unless an application to extend the currency period is approved by Council.
             Performance Bond
       10.   Security in the form of a cash bond or trading bank guarantee to the sum of
             $20,000 must be submitted to Council, to secure performance of all conditions of
             this approval, prior to the issue of a Development Permit for Building Works. The
             cash bond or trading bank guarantee will be returned on performance of the
             conditions of approval less any costs incurred by Council in respect of enforcing
             performance of this permit. Council reserves the right to call upon the bond or
             guaranteed sum to effect compliance with conditions.
             Landscaping
       11.   A minimum of 20% of the site must be retained as soft landscaping.
       12.   To screen the development, screening vegetation must be planted for the full
             length of the north and south boundaries, with the exception of the bin/gas/bike
             store area, in accordance with Council’s Planning Scheme Policy PSP2 -
             Landscaping. The planted vegetation must have a minimum pot size of 200mm
             and consist of native, endemic species with a mature height of not less than 8
             metres and a maximum spacing of 2 metre centres.
       13.   A mix of native landscaping, such as ground covers, shrubs and trees, is provided
             for a width of 5 metres from the seaward or rear boundary of the site. The planted
             vegetation must have a minimum pot size of 200mm and consist of native,
             endemic species as per Table 3.1 & 3.2 of PSP2 Landscaping for suitable coastal
             species. The planted vegetation must be planted at the following density:
             a.   trees must have a maximum spacing of 6m;
             b.   shrubs must have a maximum spacing of 1.5m; and
             c.   ground covers planted between the trees and shrub must achieve a dense
                  coverage.
       14.   The development is to provide adequate landscape buffering to protect the
             character of the beachfront, to the reasonable satisfaction of the Manager
             Development Assessment.
       15.   Two 100 litre street trees must be provided within the frontage. The trees must
             be a coastal species in accordance with PSP2 – Landscaping.
             Coastal Protection
       16.   External colours and finishes of the building must comprise                     of
             muted/environmental tones that blend with the natural environment.
             Pedestrian Access
       17.   A pedestrian access gate must not be installed along the seaward property
             boundary with direct access by residents to the beachfront area not being
             permitted.
             Geotechnical Stability
       18.   A footing system and erosion protection system must be designed for the
             proposed development to withstand the short-term erosion associated with a
             500-year average recurrence interval storm event combined with shoreline
             recession due to sea-level rise for 2100 climate change. The short-term erosion
             associated with a 500-year average recurrence interval storm event combined
             with shoreline recession due to sea-level rise for 2100 climate change to be

                                                                                Page 17 of 85
Log in to download the original file

2022-09-12 General Committee Meeting Agenda(PDF, 12MB).pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.