Skip to the record
Accept no substitutions.

Original source · versioned page text

2022-09-12 General Committee Meeting Agenda

of 85

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                       12 SEPTEMBER 2022


             adjoining lands and/or buildings and/or structures and/or services.
       32.   All earthworks and associated retaining structures/batters, both above and below
             ground level, both temporary and permanent, must be wholly contained within
             the subject site unless written permission from the respective landowner(s) is
             provided to Council.
       33.   All earthworks must be undertaken in accordance with the provisions of
             Australian Standard AS3798: Guidelines on Earthworks for Commercial and
             Residential Developments.
             Significant Weather Event
       34.   Should a significant weather event occur which results in substantial erosion
             within the site, and undermines the structure and/or renders the Detached House
             uninhabitable, the owner must
             a.   Immediately secure the perimeter of the property to prevent unauthorised
                  access and then undertake necessary works upon the land to make the
                  detached house safe and suitable for habitation in a timely manner.
                  i.     Any work proposed must be designed to ensure that the work will not
                         cause adverse impacts on other lands or on coastal processes.
                  ii.    Rock, concrete and like hard materials must not be used for the
                         construction of beach protection works.
                  iii.   Any work proposed to be carried out must be undertaken in
                         accordance with Development Permit for Operational Works.
             b.   or remove the Detached House and all associated structures including the
                  footpath crossover and make the land safe at no cost to the Council.
             Site Access and Driveways
       35.   A sealed access driveway must be provided from the existing formation in
             Seaview Terrace to all parking and manoeuvring areas of the development. The
             works must be undertaken in accordance with an Operational Works approval
             and must include a driveway located generally in accordance with the approved
             plans.
             Stormwater Drainage
       36.   Stormwater runoff from the development must be collected and disposed of in
             accordance with the recommendations of the site specific geotechnical report.
             Stormwater runoff from gutters, down-pipes, driveways, and paved areas must
             be collected and directed to Council stormwater drainage system along Seaview
             Terrace. The works must be undertaken in accordance with an Operational
             Works approval.
       37.   Prior to the commencement of the use a certificate must be issued by an RPEQ
             certifying that the stormwater drainage system has been constructed in
             accordance with the conditions of this permit.
             Easements
       38.   Unless otherwise agreed in writing by the relevant service provider, any public or
             third party infrastructure located on the subject site must be placed within an
             easement registered against the title of the property.
       39.   All easements must be designed in accordance with the planning scheme and
             granted at no cost to the Grantee. Where the Grantee is Council or a service
             authority, the easement documentation must be in accordance with the Grantee’s
             standard easement terms. Draft easement documentation must be submitted to
             Council for endorsement.

                                                                                Page 19 of 85
Log in to download the original file

2022-09-12 General Committee Meeting Agenda(PDF, 12MB).pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.