Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2022-09-12 General Committee Meeting Agenda

of 85

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                         12 SEPTEMBER 2022


        40.   All works must be kept clear of any existing or proposed easements on the
              subject land, unless agreed otherwise in writing by the Grantee.
              Damage to Services and Assets
        41.   Any damage caused to existing services and assets as a result of the
              development works must be repaired at no cost to the asset owner at the
              following times:
              a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                    immediately; or
              b.    where otherwise, upon completion of the works associated with the
                    development.
              Any repair work which proposes to alter the alignment or level of existing services
              and assets must first be referred to the relevant service authority for approval.
   B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

   REPORT
   A report for this application was presented to Council at the Planning and Environment
   Committee on 12 July 2022. The report addressed a range of issues including geotechnical,
   coastal hazards, front setback, site cover, being three storeys and the inclusion of a rooftop
   terrace. The application was recommended for approval subject to conditions.
   During the meeting a concern was raised with regards to the part of the dwelling that is
   cantilevered within the coastal building setback being enclosed and not open as required by
   the planning scheme.
   The applicant subsequently stopped the Decision-Making Period until 18 August 2022 in
   order to address privacy and overlooking concerns raised by a nearby resident. On 11 August
   2022 the applicant extended the stopped period until 15 September 2022.
   On 19 August the applicant submitted amended plans. The modifications are intended to
   address the overlooking concerns and include:
       1.4m high angled privacy screen;
       1m wide planter; and
       8m wide mature canopy tree along the northern property boundary (between the pool
        and public walkway).




                                                                                  Page 20 of 85
Log in to download the original file

2022-09-12 General Committee Meeting Agenda(PDF, 12MB).pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.