GENERAL COMMITTEE MEETING AGENDA 12 SEPTEMBER 2022
There are no formal constructed beach access facilities off David Low Way where the road
crosses Burgess Creek. Pedestrian use of this area down to the beach is via informal tracks
and has steadily increased over time particularly as other beach accesses along the coast
have become busier.
Burgess Creek is affected by erosion which requires active management. The northern bank
of the creek near the mouth, east of David Low Way is eroding due to a combination of
uncontrolled foot traffic across and down the bank, and high peak waterflow during rain
events. Many other beach visitors are also accessing the creek mouth and dunes from the
beach itself which is contributing to erosion. Bank instability ranges from minor movement of
sand to drastic slip failure.
At the mouth of the creek, up to 270 metres of the frontal dunes on the northern side of the
creek can become eroded as the creek naturally meanders to the north. Council is seeking
to better understand the reasons behind the creek’s channel migration for different rain
events and timescales, by relating observed changes to conditions such as waves, creek
water surface levels, and discharge. This will involve the development of a model that helps
explain the main triggers and predicts thresholds affecting the creek’s changes. This
modelling and analysis can also then be used to inform water quality monitoring for Burgess
Creek under different rainfall conditions.
The increased flows during the 2022 floods have further exacerbated erosion on the northern
side of all Eastern Beaches creeks. Council has recently performed channel realignment
works to straighten the Burgess Creek channel to mitigate erosion impacts, however the
channel is again slowly making its way towards the north.
On 18 November 2021 Noosa Council adopted the Coastal Hazards Adaptation Plan (CHAP)
which prioritises nature-based solutions when addressing issues at creek outlets. To support
this plan, Council is implementing an ongoing coastal monitoring program using a range of
survey and recording techniques. This includes deploying a fixed shoreline camera at
Burgess Creeks to monitor creek movement. This will be supported by satellite imagery,
onground survey and fixed wing drone survey to track erosion and accretion trends along the
length of the Eastern Beaches.
Bank stability works in public land have been undertaken at Burgess Creek, near Ross
Crescent, and near Sobraon St to protect built and natural assets. Traditionally Council has
undertaken these works in a reactive manner when sand slips become evident. However, it
is proposed that Council adopts a process of monitoring and prioritising remediation of the
Eastern Beaches creeks to enable proactive and coordinated management. Referred to as
the ‘Noosa Eastern Beaches Creeks High Risk Erosion Prioritisation Project’, this project
proposal will be submitted for consideration as part of a future budget review.
Burgess Creek presents a particularly challenging environment for pedestrian access.
Access to the creek and mouth is discouraged due to the treated effluent discharged from
the upstream sewage treatment plant owned by Unitywater, yet the location of the pathway
further upstream along the creek naturally channels foot traffic to an unofficial beach access
on the northern side of the creek. There is a significant distance between beach accesses
38 and 39 which service a high number of visitors, prompting residents to create their own
access points. New beach access standards to improve the resilience of coastal dunes are
being developed and will help inform appropriate access improvements for Burgess Creek
to better manage dune erosion.
Council carries out periodic Bushland Operational Assessments (BOAs) to inform dune
restoration. A bush regeneration zone with fencing and signage to help minimise foot traffic
is also needed, along with community consultation. The Burgess Creek Bushcare Group is
active in the area and will be an important stakeholder.
An Eastern Beaches Foreshore Management Plan is also under development addressing
the high number of management issues concentrated along the Eastern Beaches foreshore
reserves. It will help set out priorities for Council including for beach reserve protection, dune
Page 67 of 85
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.