2204-28387 SRA Response with conditions (MCU22_0048 & OPW22_0089)

of 9

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                    2204-28387 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)


 No.     Conditions                                                                     Condition timing
 Operational work
 Planning Regulation 2017, Schedule 10, Part 17, Division 3, Table 1 – Tidal works or work in a coastal
 management district—The chief executive administering the Planning Act 2016 nominates the
 Director-General of the Department of Environment and Science to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following conditions:
 1.      The construction of the finger pontoons must be carried out generally          For the duration of the
         in accordance with the following plans:                                        works
              Existing Structures Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-03, revision A
              New Site Plan, prepared by Edge Consulting Engineers,
                 dated 13/10/21, reference 34680-04, revision A
              Vessel Mooring Site Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-05, revision D
              Elevations, prepared by Edge Consulting Engineers, dated
                 13/10/21, reference 34680-07, revision A
 2.      For the proposed works, only use clean materials and ensure that               For the duration of the
         the works do not cause contamination.                                          works
 3.      Erosion and sediment control measures which are in accordance                  For the duration of the
         with Best Practice Erosion and Sediment Control (BPESC)                        works
         guidelines for Australia (International Erosion Control Association),
         are to be installed and maintained to prevent the release of sediment
         to tidal waters.
 4.      Should the finger pontoons collapse, fail or otherwise suffer                  As soon as reasonably
         structural consequences which impact their integrity or ability to             practicable subsequent
         function as intended, the works must be:                                       to the damage
             (a) reinstated in accordance with this development approval; or
             (b) removed and disposed of at an appropriately licensed
                 facility.
 5.      Submit “As Constructed drawings” to [email protected] or mail                Within two weeks of
         to:                                                                            the completion of the
            Department of Environment and Science                                       works
            Permit and Licence Management
            Implementation and Support Unit
            GPO Box 2454
            Brisbane Qld 4001
 6.           (a) In the event that the works cause disturbance or oxidisation          (a) Upon disturbance
                  of acid sulfate soil, the affected soil must be treated and               or oxidisation until
                  thereafter managed (until the affected soil has been                      the affected soil
                  neutralised or contained) in accordance with the current                  has been
                  Queensland Acid Sulfate Soil Technical Manual: Soil                       neutralised or
                  management guidelines, prepared by the Department of                      contained
                  Science, Information Technology, Innovation and the Arts,             (b) At the time the
                  2014.                                                                     soils have been
              (b) Certification by an appropriately qualified person, confirming            neutralised or
                  that the affected soil has been neutralised or contained, in              contained
                  accordance with (a) above is to be provided to


 State Assessment and Referral Agency                                                                   Page 3 of 9
Log in to download the original file

2204-28387 SRA Response with conditions (MCU22_0048 & OPW22_0089).pdf · 345 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.