Original source · versioned page text
2204-28387 SRA Response with conditions (MCU22_0048 & OPW22_0089)
2204-28387 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. Conditions Condition timing
Operational work
Planning Regulation 2017, Schedule 10, Part 17, Division 3, Table 1 – Tidal works or work in a coastal
management district—The chief executive administering the Planning Act 2016 nominates the
Director-General of the Department of Environment and Science to be the enforcement authority for
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following conditions:
1. The construction of the finger pontoons must be carried out generally For the duration of the
in accordance with the following plans: works
Existing Structures Plan, prepared by Edge Consulting
Engineers, dated 13/10/21, reference 34680-03, revision A
New Site Plan, prepared by Edge Consulting Engineers,
dated 13/10/21, reference 34680-04, revision A
Vessel Mooring Site Plan, prepared by Edge Consulting
Engineers, dated 13/10/21, reference 34680-05, revision D
Elevations, prepared by Edge Consulting Engineers, dated
13/10/21, reference 34680-07, revision A
2. For the proposed works, only use clean materials and ensure that For the duration of the
the works do not cause contamination. works
3. Erosion and sediment control measures which are in accordance For the duration of the
with Best Practice Erosion and Sediment Control (BPESC) works
guidelines for Australia (International Erosion Control Association),
are to be installed and maintained to prevent the release of sediment
to tidal waters.
4. Should the finger pontoons collapse, fail or otherwise suffer As soon as reasonably
structural consequences which impact their integrity or ability to practicable subsequent
function as intended, the works must be: to the damage
(a) reinstated in accordance with this development approval; or
(b) removed and disposed of at an appropriately licensed
facility.
5. Submit “As Constructed drawings” to [email protected] or mail Within two weeks of
to: the completion of the
Department of Environment and Science works
Permit and Licence Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001
6. (a) In the event that the works cause disturbance or oxidisation (a) Upon disturbance
of acid sulfate soil, the affected soil must be treated and or oxidisation until
thereafter managed (until the affected soil has been the affected soil
neutralised or contained) in accordance with the current has been
Queensland Acid Sulfate Soil Technical Manual: Soil neutralised or
management guidelines, prepared by the Department of contained
Science, Information Technology, Innovation and the Arts, (b) At the time the
2014. soils have been
(b) Certification by an appropriately qualified person, confirming neutralised or
that the affected soil has been neutralised or contained, in contained
accordance with (a) above is to be provided to
State Assessment and Referral Agency Page 3 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.