2204-28387 SRA Response with conditions (MCU22_0048 & OPW22_0089)

of 9

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                       2204-28387 SRA




                 [email protected] or mailed to:
                   Department of Environment and Science
                   Permit and Licence Management
                   Implementation and Support Unit
                   GPO Box 2454
                   Brisbane Qld 4001

        Note: Appropriately qualified person means a person or persons who has
        professional qualifications, training, skills and experience relevant to soil
        chemistry or acid sulfate soil management and can give authoritative
        assessment, advice and analysis in relation to acid sulfate soil management
        using the relevant protocols, standards, methods or literature.
Planning Regulation 2017, Schedule 10, Part 17, Division 3, Table 2 – Tidal works or work in a coastal
management district — The chief executive administering the Planning Act 2016 nominates the
Director-General of the Department of Transport and Main Roads – Maritime Safety Queensland to be
the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:
7.      The operational work must be carried out generally in accordance                For the duration of the
        with the following plan:                                                        works
             Cover Page, prepared by Edge Consulting Engineers, dated
                 2/11/21, reference 34680-01, revision O
             Existing Structures Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-02, revision A
             Existing Structures Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-03, revision A
             New Site Plan, prepared by Edge Consulting Engineers,
                 dated 13/10/21, reference 34680-04, revision A
             Vessel Mooring Site Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-05, revision D
             Pontoon Layout Details, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-06, revision A
             Elevations, prepared by Edge Consulting Engineers, dated
                 13/10/21, reference 34680-07, revision A
             Pile Setout, prepared by Edge Consulting Engineers, dated
                 13/10/21, reference 34680-08, revision A.
8.      All vessels, structures, plant and equipment associated with the                While the works are
        construction of the approved works must be lit/marked in accordance             occurring
        with the following specifications and requirements such that
        undertaking the construction works does not cause a risk to the safe
        navigation of ships:
             (a) any anchors deployed must be marked with yellow buoys
                 and fitted with FL yellow lights fitted
             (b) lighting provided must not obscure, disguise or otherwise
                 interfere with the effectiveness of navigational lighting.
9.      The structure must be lit/marked in accordance with the following               At all times
        specifications, such that it does not cause a risk to the safe
        navigation of other ships:
            (a) pedestrian style lighting to gang way and/or retro reflective
                tape on pontoon piles
            (b) lighting provided must not obscure, disguise or otherwise
                interfere with the effectiveness of navigational lighting.
10.     The construction, operation or maintenance of the structure and any             At all times
        ship moored at this structure, must not impede the safe navigation of
        other ships or restrict safe access to or from neighbouring structures.
11.          (a) Any debris or similar obstruction encountered whilst                   (a) and (b) At all times
                 undertaking the work must be disposed of at the applicant’s


State Assessment and Referral Agency                                                                      Page 4 of 9
Log in to download the original file

2204-28387 SRA Response with conditions (MCU22_0048 & OPW22_0089).pdf · 345 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.