Original source · versioned page text
2204-28387 SRA Response with conditions (MCU22_0048 & OPW22_0089)
2204-28387 SRA
[email protected] or mailed to:
Department of Environment and Science
Permit and Licence Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001
Note: Appropriately qualified person means a person or persons who has
professional qualifications, training, skills and experience relevant to soil
chemistry or acid sulfate soil management and can give authoritative
assessment, advice and analysis in relation to acid sulfate soil management
using the relevant protocols, standards, methods or literature.
Planning Regulation 2017, Schedule 10, Part 17, Division 3, Table 2 – Tidal works or work in a coastal
management district — The chief executive administering the Planning Act 2016 nominates the
Director-General of the Department of Transport and Main Roads – Maritime Safety Queensland to be
the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:
7. The operational work must be carried out generally in accordance For the duration of the
with the following plan: works
Cover Page, prepared by Edge Consulting Engineers, dated
2/11/21, reference 34680-01, revision O
Existing Structures Plan, prepared by Edge Consulting
Engineers, dated 13/10/21, reference 34680-02, revision A
Existing Structures Plan, prepared by Edge Consulting
Engineers, dated 13/10/21, reference 34680-03, revision A
New Site Plan, prepared by Edge Consulting Engineers,
dated 13/10/21, reference 34680-04, revision A
Vessel Mooring Site Plan, prepared by Edge Consulting
Engineers, dated 13/10/21, reference 34680-05, revision D
Pontoon Layout Details, prepared by Edge Consulting
Engineers, dated 13/10/21, reference 34680-06, revision A
Elevations, prepared by Edge Consulting Engineers, dated
13/10/21, reference 34680-07, revision A
Pile Setout, prepared by Edge Consulting Engineers, dated
13/10/21, reference 34680-08, revision A.
8. All vessels, structures, plant and equipment associated with the While the works are
construction of the approved works must be lit/marked in accordance occurring
with the following specifications and requirements such that
undertaking the construction works does not cause a risk to the safe
navigation of ships:
(a) any anchors deployed must be marked with yellow buoys
and fitted with FL yellow lights fitted
(b) lighting provided must not obscure, disguise or otherwise
interfere with the effectiveness of navigational lighting.
9. The structure must be lit/marked in accordance with the following At all times
specifications, such that it does not cause a risk to the safe
navigation of other ships:
(a) pedestrian style lighting to gang way and/or retro reflective
tape on pontoon piles
(b) lighting provided must not obscure, disguise or otherwise
interfere with the effectiveness of navigational lighting.
10. The construction, operation or maintenance of the structure and any At all times
ship moored at this structure, must not impede the safe navigation of
other ships or restrict safe access to or from neighbouring structures.
11. (a) Any debris or similar obstruction encountered whilst (a) and (b) At all times
undertaking the work must be disposed of at the applicant’s
State Assessment and Referral Agency Page 4 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.