Original source · versioned page text
UPDATED 16.5.23 - 20210153 Maple St SWMP
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
The configuration of the MUSIC node is presented below in Figure 4.4 – 50kL Reuse Tank node
configuration
Figure 4.4 – 50kL Reuse Tank node configuration
4.2.1.2. Bioretention Areas
A 20m² bioretention areas is to be provided along the southern boundary in the lower portion of
the development, to capture and treat surface run-off from the driveways as well as the outflows
from the attenuation tanks. The bioretention areas are modelled in accordance with the Water by
Design MUSIC Guidelines 2018 with the node configuration for one of the areas shown below in
Figure 4.5 – Bioretention Node details.
A bioretention area is to have a filter media depth of minimum of 700mm to ensure deep rooting
trees and plantings are able to be established without impacting the subsoil drainage lines in
accordance with the Water by Design Bioretention Technical Design Guidelines v1.1 (2014). A 1m
filter media depth has been proposed for the swale to ensure adequate depth for deep rooting
plantings and trees.
Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31 Page 19 of 27
Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (UPDATED 16.5.23 - 20210153 Maple St SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.