Council archive · source document
Request for Further Information - 010.2009.00000882.001 [As Published] · 132009.882
Officer: Denis Wallace
Direct Telephone: 5449 5179
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2009/882
Your Reference:
8 September 2009
Des Crawford
35/15 Heathfield Avenue
COOLUM BEACH QLD 4573
Dear Sir
Information Request
Integrated Planning Act 1997
I refer to your application and wish to advise that we require further information to satisfactorily
assess the proposal. Please provide four (4) copies of all information to be supplied, including an A3
set of plans and a CD copy.
1 APPLICATION DETAILS
Application No: 2009/882
Proposal: Multiple Housing Type 4 (6 x Units)
Street address: 1 Hill Street & 162 Edwards Street SUNSHINE BEACH
Real property description: Lot 106 RP94566 & Lot 107 RP94566
Planning Scheme: The Noosa Plan
2 INFORMATION REQUIRED
The information requested is set out below:
Planning
1. Please provide the following plans:
1.1. Longitudinal sections for Block B and elevations and sections for Block A.
1.2. A roof plan for the development which also indicates the site contours.
1.3. Indicate the Reduced Levels (RLs) of the roofs on the elevations.
1.4. Indicate pedestrian pathways within the site and access routes to each
dwelling.
1.5. Indicate the bin storage area/locations and common bin wash-down area on
the plans.
1.6. Preliminary landscaping plans indicating areas of soft and hard landscaping,
garden beds and plantings.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
-2-
Engineering
Note - Compliance with Council’s Codes and Planning Scheme Policies is required,
particularly the following codes and policies are considered most relevant to the
proposed development:
Driveways & Carparking Code,
Earthworks Code;
Existing Services Code;
Transport, Roads & Drainage Code;
Water Sensitive Design Code;
PSP 5 - Engineering Design Standards - Roads, Drainage and Earthworks; &
PSP 6 – Engineering Design Standards Water & Sewerage.
Whilst a detailed assessment of these Codes will take place at the Operational Works
stage, it is important that the development considers these Codes and Policies prior
to obtaining a Material Change of Use approval, as they may impact on the proposal.
2. Provide an accurate survey plan of the site (including the immediate surrounds) that
incorporates:
2.1 Contours lines at hight interval not exceeding 0.5m.
2.2 Existing trees.
2.3 Existing structures, buildings and fences.
2.4 Existing services: sewer mains, stormwater pipelines and structures, water,
telecommunication and power poles including those within the road reserve
and adjacent to the site.
2.5 The edges of bitumen and kerb line and barrier along the service road.
3. Provide a general design of the proposed vehicle access to the site and proposed
parking spaces showing the grades and finished levels of the driveways.
4. Please provide engineering design plans to show the depth of excavation and the
detail of the retention method to be used on development site. The design shall also
demonstrate that the excavation and retention method will not adversely impact on
the structural integrity of the existing sewer main or compromise access to this main
for maintenance purposes and/or upgrading works.
5. Provide a plan, with relevant dimensions verifying all buildings and structures
including masonry walls, roof overhang and stairwells are located a minimum of 1.5
metres from the nearest part of Council’s sewerage infrastructure. Councils Planning
Scheme Codes require a minimum clearance of 1.5 metres from the nearest part of
the council sewer to the outermost projection of any building or structure.
Page 3
-3-
6. Provide stormwater design and strategy for the site that caters for stormwater runoff
from the upstream properties. The stormwater system should be designed for a
minimum 1 in 5 years Average Recurrence Interval (ARI) design storm and the
overland flow path be designed for a 1 in 100 year ARI design storm and indicate
allocation of stormwater inter-allotment easement/s where necessary. The piped
stormwater should be discharged into an existing stormwater structure and overland
runoff from the site over the service road should be avoided or minimised. The design
should also indicate the location of rainwater storage system or tank to be installed in
accordance with the Queensland Development Code (QDC) current at the time of
building approval, and shall be part of the plumbing application for approval.
The design should also include a gross pollutant trap (s) or grease/oil arrestor (s) to
ensure that polluted run-off from the carparking areas and the driveways will have the
first flush (the first 12 mm of rainfall or hose-down) collected in the gross pollutant trap
(s) or grease arrestor (s) provided on site prior to being permitted to discharge into
Council’s drainage system.
Under the provisions of the Integrated Planning Act 1997, you have three options available in
response to this Information Request. You may give the assessment manager (in this instance
Council) and each referral agency (if any):
1. all of the information requested; or
2. part of the information requested together with a letter asking the assessment manager and
each referral agency to proceed with the assessment of the application; or
3. a letter:
(i) stating that you do not intend to supply any of the information requested; and
(ii) asking the assessment manager and each referral agency to proceed with the
assessment of the application.
Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the applicant is to
respond to any information request within 12 months of the request or otherwise, the application
lapses.
A response to the above is required to be submitted, prior to further assessment of the application. If
any further matters arise as part of assessment of this application, you will be advised accordingly.
Council prefers that all the information requested be submitted as one package. A preliminary
assessment only of the application has been undertaken and during the formal decision stage, or as
a result of public exhibition, other matters may arise. You are requested to advise your client directly
regarding this request.
Information on the status of development applications may be viewed using PD Online, which is
accessible via the Sunshine Coast Regional Council website www.sunshinecoast.qld.gov.au . Using
the "Quick Links" on the left hand side of the screen, users may select "PD Online" by clicking on it,
which will take users to the Planning and PD Online page. At this point, a disclaimer will show; users
may click on "agree" if they agree and can enter either the development application number, or the
address of the property to start viewing information on it on the application.
Should you have any further queries in relation to the above, please do not hesitate to contact me on
the above number.
Yours faithfully,
Denis Wallace
Senior Development Planner
Used in these records
Request for Further Information - 010.2009.00000882.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18 KB (small file)
- File type
No other editions are linked here.