Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Request for Further Information - 010.2009.00000882.001 [As Published] · 132009.882

of 3

Text shows just the words. Original shows the document exactly as it was published.

                                             -2-


Engineering
      Note - Compliance with Council’s Codes and Planning Scheme Policies is required,
      particularly the following codes and policies are considered most relevant to the
      proposed development:
          Driveways & Carparking Code,
          Earthworks Code;
          Existing Services Code;
          Transport, Roads & Drainage Code;
          Water Sensitive Design Code;
          PSP 5 - Engineering Design Standards - Roads, Drainage and Earthworks; &
          PSP 6 – Engineering Design Standards Water & Sewerage.
     Whilst a detailed assessment of these Codes will take place at the Operational Works
     stage, it is important that the development considers these Codes and Policies prior
     to obtaining a Material Change of Use approval, as they may impact on the proposal.
2.   Provide an accurate survey plan of the site (including the immediate surrounds) that
     incorporates:
     2.1      Contours lines at hight interval not exceeding 0.5m.
     2.2      Existing trees.
     2.3      Existing structures, buildings and fences.
     2.4      Existing services: sewer mains, stormwater pipelines and structures, water,
              telecommunication and power poles including those within the road reserve
              and adjacent to the site.
     2.5      The edges of bitumen and kerb line and barrier along the service road.
3.   Provide a general design of the proposed vehicle access to the site and proposed
     parking spaces showing the grades and finished levels of the driveways.
4.   Please provide engineering design plans to show the depth of excavation and the
     detail of the retention method to be used on development site. The design shall also
     demonstrate that the excavation and retention method will not adversely impact on
     the structural integrity of the existing sewer main or compromise access to this main
     for maintenance purposes and/or upgrading works.
5.   Provide a plan, with relevant dimensions verifying all buildings and structures
     including masonry walls, roof overhang and stairwells are located a minimum of 1.5
     metres from the nearest part of Council’s sewerage infrastructure. Councils Planning
     Scheme Codes require a minimum clearance of 1.5 metres from the nearest part of
     the council sewer to the outermost projection of any building or structure.

Used in these records

About this file

File size
18 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request for Further Information - 010.2009.00000882.001 [As Published].pdf · 18 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.