6. Provide stormwater design and strategy for the site that caters for stormwater runoff
from the upstream properties. The stormwater system should be designed for a
minimum 1 in 5 years Average Recurrence Interval (ARI) design storm and the
overland flow path be designed for a 1 in 100 year ARI design storm and indicate
allocation of stormwater inter-allotment easement/s where necessary. The piped
stormwater should be discharged into an existing stormwater structure and overland
runoff from the site over the service road should be avoided or minimised. The design
should also indicate the location of rainwater storage system or tank to be installed in
accordance with the Queensland Development Code (QDC) current at the time of
building approval, and shall be part of the plumbing application for approval.
The design should also include a gross pollutant trap (s) or grease/oil arrestor (s) to
ensure that polluted run-off from the carparking areas and the driveways will have the
first flush (the first 12 mm of rainfall or hose-down) collected in the gross pollutant trap
(s) or grease arrestor (s) provided on site prior to being permitted to discharge into
Council’s drainage system.
Under the provisions of the Integrated Planning Act 1997, you have three options available in
response to this Information Request. You may give the assessment manager (in this instance
Council) and each referral agency (if any):
1. all of the information requested; or
2. part of the information requested together with a letter asking the assessment manager and
each referral agency to proceed with the assessment of the application; or
3. a letter:
(i) stating that you do not intend to supply any of the information requested; and
(ii) asking the assessment manager and each referral agency to proceed with the
assessment of the application.
Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the applicant is to
respond to any information request within 12 months of the request or otherwise, the application
lapses.
A response to the above is required to be submitted, prior to further assessment of the application. If
any further matters arise as part of assessment of this application, you will be advised accordingly.
Council prefers that all the information requested be submitted as one package. A preliminary
assessment only of the application has been undertaken and during the formal decision stage, or as
a result of public exhibition, other matters may arise. You are requested to advise your client directly
regarding this request.
Information on the status of development applications may be viewed using PD Online, which is
accessible via the Sunshine Coast Regional Council website www.sunshinecoast.qld.gov.au . Using
the "Quick Links" on the left hand side of the screen, users may select "PD Online" by clicking on it,
which will take users to the Planning and PD Online page. At this point, a disclaimer will show; users
may click on "agree" if they agree and can enter either the development application number, or the
address of the property to start viewing information on it on the application.
Should you have any further queries in relation to the above, please do not hesitate to contact me on
the above number.
Yours faithfully,
Denis Wallace
Senior Development Planner
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2009.00000882.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18 KB (small file)
- File type
No other editions are linked here.